My WebLink
|
Help
|
About
|
Sign Out
Appendix B - Air Quality - GHG Emissions and Energy Supporting Information COMBINED
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
12-10
>
ITEM 5 EXHIBIT A
>
Appendix B - Air Quality - GHG Emissions and Energy Supporting Information COMBINED
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2025 3:56:02 PM
Creation date
12/2/2025 3:55:25 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Multi-land Use Screening Tool Overview <br />Instructions <br />Land Use Category Land Use Type Unit Project <br />Land Use Size <br />Has Overlapping <br />Construction <br />Phases? <br />Residential Single Family Housing DU 30.0 FALSE <br />Recreational City Park Acres 70.0 FALSE <br />FALSE <br />FALSE <br />FALSE <br />FALSE <br />FALSE <br />FALSE <br />FALSE <br />FALSE <br />FALSE <br />FALSE <br />FALSE <br />FALSE <br />FALSE <br />FALSE <br />FALSE <br />FALSE <br />FALSE <br />FALSE <br />Developed by <br />Last updated:5/6/2022 <br />This screening tool helps to determine whether the daily construction or operational emissions associated <br />with a proposed land use development project with multiple land use types would exceed BAAQMD's <br />average daily thresholds. <br />Exceeds Construction Threshold? <br />Exceeds Operational Threshold? <br />BAAQMD's Recommendation <br />Use the drop-down menus to select the land use category and land use type for each type of land use <br />included in the project. Enter the proposed size of each land use based on the default units that are <br />autopopulated in column D. <br />The tool will estimate whether the project may exceed the construction thresholds, operational <br />thresholds, or both, and whether further analysis is needed before making a significance determination. <br />This tool will not work for projects which have construction-related activities overlapping with operational <br />activities, and vice versa. <br />Construction and Operation Screening Tool <br />YES <br />NO <br />Further Analysis Required <br />Appendix B 50 <br />BAY AREA Al R Q.!,!ALITY <br />MANAG EM ENT DIST RICT <br />n <br />□ <br />□ <br />□ <br />□ <br />□ <br />□ <br />□ <br />□ <br />□ <br />□ <br />□ <br />□ <br />□ <br />□ <br />□ <br />□ <br />□ <br />□ <br />□
The URL can be used to link to this page
Your browser does not support the video tag.