Laserfiche WebLink
5.3. Construction Vehicles <br />5.3.1 Unmitigated <br />Phase Name Trip Type One-Way Trips per Day Miles per Trip Days VMT Vehicle Mix <br />Site Preparation (Demo + Removal of Trees)Worker 15 11.7 12 2106 LDA,LDT1,LDT2 <br />Site Preparation (Demo + Removal of Trees)Vendor 8.4 HHDT,MHDT <br />Site Preparation (Demo + Removal of Trees)Hauling 6 20 12 1520 HHDT <br />Site Preparation (Demo + Removal of Trees)Onsite truck HHDT <br />Grading Worker 20 11.7 35 8190 LDA,LDT1,LDT2 <br />Grading Vendor 8.4 HHDT,MHDT <br />Grading Hauling 507 20 35 355000 HHDT <br />Grading Onsite truck HHDT <br />Building Construction Worker 11 11.7 460 58126 LDA,LDT1,LDT2 <br />Building Construction Vendor 3 8.4 460 12392 HHDT,MHDT <br />Building Construction Hauling 0 20 460 0 HHDT <br />Building Construction Onsite truck HHDT <br />Paving Worker 15 11.7 10 1755 LDA,LDT1,LDT2 <br />Paving Vendor 14 8.4 10 1176 HHDT <br />Paving Hauling 0 20 10 0 HHDT <br />Paving Onsite truck HHDT <br />Architectural Coating Worker 2 11.7 60 1516 LDA,LDT1,LDT2 <br />Architectural Coating Vendor 8.4 HHDT,MHDT <br />Architectural Coating Hauling 0 20 60 0 HHDT <br />Architectural Coating Onsite truck HHDT <br />VMT TOTALSVehicle Category <br />mpg gal/mile EMFAC Vehicle Category 71693 LDA,LDT1,LDT2 <br />31.35 0.032 LDA 12392 HHDT,MHDT <br />Alameda County 2026 <br />Fuel Efficiency <br />(MPG) <br />Fuel <br />(gallons) <br />27.33 2623 <br />7.34 1688 <br />8.53 0 <br />6.15 58162 <br />62,474 <br />Appendix B 54