My WebLink
|
Help
|
About
|
Sign Out
Appendix B - Air Quality - GHG Emissions and Energy Supporting Information COMBINED
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
12-10
>
ITEM 5 EXHIBIT A
>
Appendix B - Air Quality - GHG Emissions and Energy Supporting Information COMBINED
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2025 3:56:02 PM
Creation date
12/2/2025 3:55:25 PM
Metadata
Fields
Template:
CITY CLERK
Text box
ID:
1
Creator:
PLAN1
Created:
12/2/2025 3:56 PM
Modified:
12/2/2025 3:56 PM
Text:
https://www.cityofpleasantonca.gov/gov/depts/engineering/stormwater.asp
ID:
2
Creator:
PLAN1
Created:
12/2/2025 3:56 PM
Modified:
12/2/2025 3:56 PM
Text:
https://www.readyforwildfire.org/prepare-for-wildfire/get-ready/defensible-space/
ID:
3
Creator:
PLAN1
Created:
12/2/2025 3:56 PM
Modified:
12/2/2025 3:56 PM
Text:
https://www.readyforwildfire.org/prepare-for-wildfire/get-ready/hardening-your-home/
ID:
4
Creator:
PLAN1
Created:
12/2/2025 3:56 PM
Modified:
12/2/2025 3:56 PM
Text:
https://www.readyforwildfire.org/prepare-for-wildfire/get-ready/hardening-your-home/
ID:
5
Creator:
PLAN1
Created:
12/2/2025 3:56 PM
Modified:
12/2/2025 3:56 PM
Text:
https://www.lpfire.org/about-us/fire-prevention-division/vegetation-management-wildfires/wildlife-preparation-and-response
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Revised June 2023 Page 10 of 10 <br />SF Bay <br />Region <br />Requirements <br />All Projects <br />25.Stormwater Management. For projects creating <br />and/or replacing more than 2,500 square-feet of <br />impervious surface, will the Project incorporate on-site <br />stormwater management consistent with the NPDES <br />permit and City stormwater management requirements? <br />Yes☐ <br />No☐ <br />N/A☐ <br />Overall Sustainability <br />Urban Forest <br />CAP 2.0 <br />(P13) All Projects <br />26.Tree Planting. If planting is proposed, will the Project <br />include climate-adapted plantings? If trees are removed, <br />will the Project include replacement climate-adapted <br />trees? Indicate the plan sheet(s) where tree information <br />is provided. <br />Yes☐ <br />No☐ <br />N/A☐ <br />Wildfire Prevention <br />CAP 2.0 <br />(S9) All Projects <br />27.Wildfire Prevention and Preparation. Will the <br />Project incorporate a wildfire-defensible space, fire <br />hardening retrofits, and commit to fire prevention through <br />site maintenance (e.g., regularly cleaning out rain <br />gutters) and preparation? Voluntary <br />Yes☐ <br />No☐ <br />N/A☐ <br />As described in the project description, a total of <br />232 trees would be planted, consisting predominantly <br />of red maple (Acer rubrum), Marina strawberry <br />(Arbutus unedo), white ash (Fraximus americana), <br />London plane tree (Platanus acerifolia), and coast live <br />oak (Quercus agrifolia). These tree species would <br />require low to medium amounts of water <br />X <br />XX <br />X <br />X <br />The proposed project includes bio-retention areas <br />for on-site stormwater management throughout the <br />site, including near the proposed main entrance <br />from Dublin Canyon Road, and along internal private <br />Street A. Throughout the project site, proposed <br />storm drains would connect to the bio-retention <br />areas for pre-treatment before connecting to the <br />City’s existing storm drainage system off-site <br />Appendix B 64
The URL can be used to link to this page
Your browser does not support the video tag.