Laserfiche WebLink
+&0WK7:6&,QWHUVHFWLRQ6XPPDU\&XPXODWLYH1R3URMHFW30 <br />'XEOLQ&DQ\RQ5G &DQ\RQ0HDGRZV'U 09/13/2019 <br />Hidden Canyon (Lester Property) TIS Synchro 10 Report <br />TJKM Page 2 <br />Intersection <br />Int Delay, s/veh 0.9 <br />Movement EBL EBT WBT WBR SBL SBR <br />Lane Configurations <br />Traffic Vol, veh/h 7 875 137 44 27 4 <br />Future Vol, veh/h 7 875 137 44 27 4 <br />Conflicting Peds, #/hr 0 00000 <br />Sign Control Free Free Free Free Stop Stop <br />RT Channelized - None - None - None <br />Storage Length - - - - 0 35 <br />Veh in Median Storage, # - 0 0 - 0 - <br />Grade, % - 0 0 - 0 - <br />Peak Hour Factor 92 92 90 90 75 75 <br />Heavy Vehicles, % 2 22222 <br />Mvmt Flow 8 951 152 49 36 5 <br />Major/Minor Major1 Major2 Minor2 <br />Conflicting Flow All 201 0 - 0 1144 177 <br /> Stage 1 - - - - 177 - <br /> Stage 2 - - - - 967 - <br />Critical Hdwy 4.12 - - - 6.42 6.22 <br />Critical Hdwy Stg 1 - - - - 5.42 - <br />Critical Hdwy Stg 2 - - - - 5.42 - <br />Follow-up Hdwy 2.218 - - - 3.518 3.318 <br />Pot Cap-1 Maneuver 1371 - - - 221 866 <br /> Stage 1 - - - - 854 - <br /> Stage 2 - - - - 369 - <br />Platoon blocked, %- - - <br />Mov Cap-1 Maneuver 1371 - - - 218 866 <br />Mov Cap-2 Maneuver - - - - 218 - <br /> Stage 1 - - - - 844 - <br /> Stage 2 - - - - 369 - <br />Approach EB WB SB <br />HCM Control Delay, s 0.1 0 22.8 <br />HCM LOS C <br />Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1SBLn2 <br />Capacity (veh/h)1371 - - - 218 866 <br />HCM Lane V/C Ratio 0.006 - - - 0.165 0.006 <br />HCM Control Delay (s) 7.6 0 - - 24.8 9.2 <br />HCM Lane LOS A A - - C A <br />HCM 95th %tile Q(veh) 0 - - - 0.6 0