Laserfiche WebLink
Transportation Impact Study for Hidden Canyon Residences & Preserve <br />March 2023 Page | 34 <br />4.4 PEDESTRIAN, BICYCLE, AND TRANSIT IMPACT FINDINGS <br />Pedestrian Impacts <br />Pedestrian circulation within the project site would be accommodated by 5-foot wide sidewalks on both <br />sides of the proposed Street B, except between Lots 2 and 6 where the sidewalk would be limited to one <br />side only. For Street A, five-foot wide sidewalks would be constructed along the frontage of residential <br />lots only. In addition, the proposed emergency vehicle access (EVA) road will provide a direct connection <br />for pedestrians between Street A and Dublin Canyon Road. A sidewalk is being proposed along the south <br />side of Dublin Canyon Road between EVA and the EBRPD Driveway. Further, a sidewalk is also being <br />proposed along the west side of the EBRPD Driveway. <br />The installation of the signal at Dublin Canyon Road and Canyon Meadows Drive would provide a <br />protected pedestrian crossing across Dublin Canyon Road for residents trying to access the nearby park, <br />thereby improving conditions for pedestrians. <br />The project is not anticipated to negatively interfere with pedestrian accessibility to the adjoining areas. <br />The project would not conflict with an existing or other planned pedestrian facilities nor would the project <br />conflict with policies related to pedestrian travel adopted by the City of Pleasanton. Therefore, the impact <br />to pedestrian facilities is considered less than significant. <br />Bicycle Impacts <br />Striped shoulders are provided on Dublin Canyon Road adjacent to the project site, while segments west <br />of the project site – and to the east near Foothill Road – are striped with Class II bicycle lanes. As part of <br />the project: the existing shoulders bordering the project site would be upgraded to meet Class II bicycle <br />lane standards, and as shown on the project site plans, bicycle lanes would be provided adjacent to the <br />proposed eastbound right-turn lane approaching the EBRPD Driveway. Bicycle access to the project site <br />would be adequately accommodated by the proposed Street B and EBRPD Driveway, and by the <br />proposed emergency vehicle access (EVA) road. The project is not anticipated to create a hazardous <br />condition that currently does not exist for bicyclists; or otherwise interfere with bicycle accessibility to the <br />project and adjoining areas; or conflict with an existing or planned pedestrian or bicycle facility; or conflict <br />with policies related to bicycle and pedestrian activity adopted by the City of Pleasanton. Therefore, the <br />project impact to bicycle facilities is less than significant. <br />Transit Impacts <br />No public transit service is provided on Dublin Canyon Road near the project site. The project would not <br />conflict with existing or planned transit services. The project is located within convenient bicycling <br />distance from the West Dublin/Pleasanton BART Station located approximately 1.4 miles to the east. The <br />project is not anticipated to create significant demand for public transit services above the capacity that is <br />provided or planned. The project would not conflict with transit policies adopted by the City of <br />Pleasanton, ACTC, Wheels (LAVTA) or BART for their respective facilities in the study area. Therefore, <br />impacts to transit service are expected to be less than significant. <br />