Transportation Impact Study for Hidden Canyon Residences & Preserve <br />March 2023 Page | 36 <br />5.0 NEAR TERM CONDITIONS <br />The analysis of potential project impacts under near-term conditions is based on the addition of <br />additional traffic from approved and pending developments that would generate additional traffic on <br />study area roadways. <br />5.1 NEAR TERM TRAFFIC VOLUMES <br />City staff provided the anticipated traffic volumes under Near Term No Project conditions based on <br />outputs from the City’s travel demand model. Forecasted peak-hour traffic volumes at each study <br />intersection under Near Term No Project Conditions are shown on Figure 12. <br />Traffic volumes at each study intersection under Near Term plus Project conditions is based on the <br />addition of project trips to each study intersection with no changes to lane configurations. Trip generation <br />and distribution for the proposed project are identical to that assumed under Existing plus Project <br />Conditions. Figure 13 displays projected peak hour turning movement volumes at all of the study <br />intersections for Near Term plus Project Conditions. <br />5.2 NEAR TERM IMPACT FINDINGS WITH PROPOSED PROJECT <br />Detailed LOS reports for both of the near-term scenarios are contained in Appendix D and Appendix E. <br />The intersection LOS analysis results under both Near Term No Project and Near Conditions are <br />summarized in Table 7. <br />All intersections would operate at an acceptable LOS D or better under Near Term No Project and Near <br />Term plus Project Conditions based on overall average delay to all approaches. <br />During the a.m. peak hour the stop-sign controlled intersection of Schaefer Ranch Road & Dublin Canyon <br />Road experiences would experience delay consistent with LOS F on the stop-sign controlled approach <br />(southbound Schaefer Ranch Road approaching Dublin Canyon Road) under both Near-Term No Project <br />and Near-Term plus Project conditions. Side-street approach volumes on Schaefer Ranch Road exceed the <br />peak-hour signal warrant based on volume under Existing Conditions and would continue to do so under <br />Near-term Conditions with or without the proposed project. Average delay to the stop-sign controlled <br />approach would increase by less than one second due to the project. Therefore, the project would not <br />increase delay to a minor movement at an unsignalized intersection operating at LOS F by more than 30 <br />seconds. The project is not anticipated to add traffic to the controlled approach. Overall average delay for <br />the intersection would remain consistent with LOS A. <br />With installation of a traffic signal at the intersection of Dublin Canyon Road with Canyon Meadows Drive <br />(which is being coordinated between the developer and the City to enhance traffic operations and safety), <br />the intersection is expected to continue to operate at LOS A during both peak hours. <br />Near-term traffic impacts resulting from the project would be considered less than significant based on <br />City standards. <br />