My WebLink
|
Help
|
About
|
Sign Out
BMP LPOP, LLC
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
B
>
BMP LPOP, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2025 4:53:07 PM
Creation date
12/19/2025 4:50:28 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
12/16/2025
LONG TERM AGREEMENTS - NAME
BMP LPOP, LLC
LONG TERM AGREEMENTS - TYPE
REIMBURSEMENT AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />9 <br /> <br /> <br />be billed at cost. All other printing and distribution of the documents will be the <br />responsibility of the City. <br />• Raney assumes that the City will handle any necessary tribal consultation pursuant to AB <br />52; however, Raney would be available to assist the City, upon request, and would <br />propose to amend the scope of work, schedule, and budget accordingly. <br />• Additional meetings and hearings can easily be accommodated upon request and would <br />be billed on a time-and-materials basis following Raney’s standard billing rates. <br />• Raney expects that all work will be completed within the budgeted time. If additional <br />time is necessary beyond that which has been budgeted due to unanticipated <br />circumstances, those items will need to be renegotiated. <br /> <br />Factors that would increase the scope of work and estimated costs outlined in the proposal <br />include: <br /> <br />• Attendance at additional virtual or in-person meetings or hearings; <br />• Printing of reports; <br />• Analysis of additional issues beyond those discussed in this proposal or a more detailed <br />level of analysis than described in this proposal; <br />• Additional comments and subsequent revisions beyond those included in this scope of <br />work; <br />• Receipt of extensive public comments on the Public Review IS/MND; <br />• Changes in the project; and <br />• Collection of data required beyond that described in this proposal. <br /> <br />Raney would propose to renegotiate these items, if required, or charge on a time-and-materials <br />basis. <br /> <br />Thank you for the opportunity to submit our proposal for your consideration. Additional <br />information regarding Raney’s experience, including resumes and project history, is available <br />upon request. If you have any questions regarding our scope of work or qualifications, please <br />feel free to contact me. We look forward to the continued opportunity to work with you and the <br />City of Pleasanton. <br /> <br />Thank you, <br /> <br /> <br /> <br />Nick Pappani, Vice President <br />Raney Planning & Management, Inc. <br />npappani@raneymanagement.com <br /> <br /> <br /> <br /> <br /> <br />Docusign Envelope ID: C2213450-C29A-4816-B563-5A05198303DADocusign Envelope ID: 7237309F-503B-4937-8D96-E8141C8E4261
The URL can be used to link to this page
Your browser does not support the video tag.