Laserfiche WebLink
Hana Japan Custom Report, 3/14/2025 <br />35 / 41 <br />5. Activity Data <br />5.1. Construction Schedule <br />Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description <br />Site Preparation Site Preparation 3/3/2025 5/23/2025 5.00 60.0 — <br />Grading Grading 5/26/2025 11/7/2025 5.00 120 — <br />Building Construction Building Construction 9/12/2025 4/23/2026 5.00 160 — <br />Paving Paving 8/18/2025 9/12/2025 5.00 20.0 — <br />Architectural Coating Architectural Coating 9/26/2025 5/7/2026 5.00 160 — <br />5.2. Off-Road Equipment <br />5.2.1. Unmitigated <br />Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor <br />Site Preparation Graders Diesel Average 1.00 8.00 148 0.41 <br />Site Preparation Tractors/Loaders/Back <br />hoes <br />Diesel Average 1.00 8.00 84.0 0.37 <br />Site Preparation Rubber Tired Dozers Diesel Average 1.00 7.00 367 0.40 <br />Grading Graders Diesel Average 1.00 8.00 148 0.41 <br />Grading Rubber Tired Dozers Diesel Average 1.00 8.00 367 0.40 <br />Grading Tractors/Loaders/Back <br />hoes <br />Diesel Average 2.00 7.00 84.0 0.37 <br />Building Construction Cranes Diesel Average 1.00 6.00 367 0.29 <br />Building Construction Forklifts Diesel Average 1.00 6.00 82.0 0.20 <br />Building Construction Tractors/Loaders/Back <br />hoes <br />Diesel Average 1.00 6.00 84.0 0.37 <br />Building Construction Generator Sets Diesel Average 1.00 8.00 14.0 0.74 <br />Building Construction Welders Diesel Average 3.00 8.00 46.0 0.45