Laserfiche WebLink
Hana Japan Custom Report, 3/14/2025 <br />37 / 41 <br />Paving Worker 12.5 11.7 LDA,LDT1,LDT2 <br />Paving Vendor —8.40 HHDT,MHDT <br />Paving Hauling 0.00 20.0 HHDT <br />Paving Onsite truck ——HHDT <br />Architectural Coating ———— <br />Architectural Coating Worker 0.54 11.7 LDA,LDT1,LDT2 <br />Architectural Coating Vendor —8.40 HHDT,MHDT <br />Architectural Coating Hauling 0.00 20.0 HHDT <br />Architectural Coating Onsite truck ——HHDT <br />5.4. Vehicles <br />5.4.1. Construction Vehicle Control Strategies <br />Non-applicable. No control strategies activated by user. <br />5.5. Architectural Coatings <br />Phase Name Residential Interior Area <br />Coated (sq ft) <br />Residential Exterior Area <br />Coated (sq ft) <br />Non-Residential Interior Area <br />Coated (sq ft) <br />Non-Residential Exterior Area <br />Coated (sq ft) <br />Parking Area Coated (sq ft) <br />Architectural Coating 0.00 0.00 9,668 3,223 1,082 <br />5.6. Dust Mitigation <br />5.6.1. Construction Earthmoving Activities <br />Phase Name Material Imported (Cubic <br />Yards) <br />Material Exported (Cubic <br />Yards) <br />Acres Graded (acres)Material Demolished (sq. ft.)Acres Paved (acres) <br />Site Preparation —500 56.3 0.00 — <br />Grading —22,580 120 0.00 — <br />Paving 0.00 0.00 0.00 0.00 0.41