My WebLink
|
Help
|
About
|
Sign Out
PC-2025-16
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2025
>
PC-2025-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2025 10:30:44 AM
Creation date
12/23/2025 10:28:35 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/23/2025
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Hana Japan Custom Report, 3/14/2025 <br />41 / 41 <br />Equipment Type Fuel Type <br />5.18. Vegetation <br />5.18.1. Land Use Change <br />5.18.1.1. Unmitigated <br />Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres <br />5.18.1. Biomass Cover Type <br />5.18.1.1. Unmitigated <br />Biomass Cover Type Initial Acres Final Acres <br />5.18.2. Sequestration <br />5.18.2.1. Unmitigated <br />Tree Type Number Electricity Saved (kWh/year)Natural Gas Saved (btu/year) <br />8. User Changes to Default Data <br />Screen Justification <br />Land Use Lot acreage adjusted to represent overall acreage of the project site. <br />Construction: Construction Phases Based on typical construction practices, architectural coating assumed to start two weeks after <br />the start of building construction and last for the same number of days. Demolition not required <br />for the proposed project. Phase timing based on project specific information provided by the <br />applicant team.
The URL can be used to link to this page
Your browser does not support the video tag.