My WebLink
|
Help
|
About
|
Sign Out
PC-2025-16
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2025
>
PC-2025-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2025 10:30:44 AM
Creation date
12/23/2025 10:28:35 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/23/2025
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Hana Japan Steak House 5150.100.001 <br />Hana Japan Steak House January 15, 2025 <br />GEOTECHNICAL REPORT UPDATE Page 2 <br /> <br />Section 5.1 <br /> <br />This section is updated to indicate that the colluvium is thicker in the western portion of the site. <br />Based on the explorations and the finished floor at Elevation 382 feet, we anticipate that most, if <br />not all of the soil will be removed down to bedrock across the building footprint. The thick layers <br />of colluvium were encountered outside of the building footprint. If any soft colluvium is <br />encountered at the base of the cut, it should be removed and reworked. <br /> <br />Section 5.4.1 <br /> <br />This section is updated to indicate that the secondary displacement across the building pad could <br />result in lateral offset up to 4 inches. As such , the criteria in Section 7.1 should be implemented <br />in building foundation design, as well as connections to utilities that cannot be repaired after an <br />earthquake. <br /> <br />Section 5.4.3 <br /> <br />This section is updated to indicate that the updated Reference 1 should be used for seismic design <br />of the building. <br /> <br />Section 5.5 <br /> <br />This section is updated to indicate that during grading, samples should be collected from the <br />building pad for the purpose of performing resistivity testing to check if special corrosion <br />resistance measures are necessary for buried metals in contact with s ite soil. <br /> <br />Section 6 <br /> <br />This section is updated to refer to Section 6 in lieu of Section 4. <br /> <br />Section 6.1 <br /> <br />This section is updated to define building pad as the top of finished subgrade in the building <br />footprint. Acceptable fill for any required overexcavation should conform with Section 6.5. <br /> <br />Section 6.4 <br /> <br />This section is updated to refer to Section 6.5 in lieu of Section 4.5. <br /> <br />Section 6.5 <br /> <br />This section is updated to indicate that for building pad fill, only material with a plasticity index of <br />12 or less should be used. <br /> <br />Section 6.6.2.2 <br /> <br />This section is updated to replace the text of Item 2 with, “Trench backfill should be moisture <br />conditioned outside of the trench to a moisture content at or slightly above the optimum moisture <br />content.” <br />
The URL can be used to link to this page
Your browser does not support the video tag.