My WebLink
|
Help
|
About
|
Sign Out
PC-2025-16
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2025
>
PC-2025-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2025 10:30:44 AM
Creation date
12/23/2025 10:28:35 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/23/2025
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ENGEO <br /> INCORPORATED <br /> <br /> <br />5150.100.101 <br />May 2, 2008 Page 12 <br />As used in this report, the term “moisture condition” refers to adjusting the moisture content of <br />the soil by either drying if too wet or adding water if too dry. <br /> <br />We define “structural areas” in Section 4 of this report as any area sensitive to settlement of <br />compacted soil. These areas include, but are not limited to building pads, sidewalks, pavement <br />areas, and retaining walls. <br /> <br />6.1 EXPANSIVE SOIL MITIGATION <br /> <br />Any potentially expansive clay encountered within building pads should be removed to a depth <br />of at least 3 feet below pad grade, as determined by an ENGEO representative. Because the site <br />will have extensive cutting of the native material, any expansive material that is encountered <br />should be removed from the site during cut and fill operations. In addition, no potentially <br />expansive clay should be placed within the upper 3 feet of building pads. <br /> <br />6.2 BUILDING PAD PREPARATION <br /> <br />Because of the depth of cut across the site and the presence of colluvial deposits in one half of <br />the building footprint, there is a possibility of encountering soil on one side of the building pad <br />and rock on the other. To reduce the risk of differential settlement due to the relative stiffness <br />difference between these materials, we recommend that the building pad be overexcavated and <br />backfilled with acceptable compacted fill. In building pads, and extending laterally a minimum <br />of 5 feet beyond, the foundation soil should be overexcavated a minimum of 2 feet and the <br />excavation should be backfilled with properly compacted, processed fill. Fill material type and <br />compaction should meet the requirements of this report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.