My WebLink
|
Help
|
About
|
Sign Out
PC-2025-16
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2025
>
PC-2025-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2025 10:30:44 AM
Creation date
12/23/2025 10:28:35 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/23/2025
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ENGEO <br /> INCORPORATED <br /> <br /> <br />5150.100.101 <br />May 2, 2008 Page 15 <br />Compact the pavement Caltrans Class 2 Aggregate Base section to at least 95 percent relative <br />compaction (ASTM D1557). Moisture condition aggregate base to or slightly above the <br />optimum moisture content prior to compaction. <br /> <br />6.6.2 Underground Utility Backfill <br /> <br />6.6.2.1 General <br /> <br />The contractor is responsible for conducting all trenching and shoring in accordance with <br />CALOSHA requirements. Project consultants involved in utility design should specify pipe <br />bedding materials. <br /> <br />6.6.2.2 Structural Areas <br /> <br />Place and compact trench backfill as follows: <br /> <br />1. Trench backfill should have a maximum particle size of 8 inches; <br /> <br />2. Moisture condition trench backfill to or slightly above the optimum moisture content. <br />Moisture condition backfill outside the trench; <br /> <br />3. Place fill in loose lifts not exceeding 12 inches; <br /> <br />4. Compact fill to a minimum of 90 percent relative compaction (ASTM D1557). <br /> <br />Where utility trenches cross perimeter building foundations, backfill with native clay soil for <br />pipe bedding and backfill for a distance of 2 feet on each side of the foundation. This will help <br />prevent the normally granular bedding materials from acting as a conduit for water to enter <br />beneath the building. As an alternative, a sand cement slurry (minimum 28-day compressive <br />strength of 500 psi) may be used in place of native clay soil. <br />
The URL can be used to link to this page
Your browser does not support the video tag.