My WebLink
|
Help
|
About
|
Sign Out
PC-2025-16
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2025
>
PC-2025-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2025 10:30:44 AM
Creation date
12/23/2025 10:28:35 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/23/2025
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ENGEO <br /> INCORPORATED <br /> <br /> <br />5150.100.101 <br />May 2, 2008 Page 28 <br />We strived to perform our professional services in accordance with generally accepted <br />geotechnical engineering principles and practices currently employed in the area; no warranty is <br />expressed or implied. <br /> <br />We developed this report with limited subsurface exploration data. We assumed that our <br />subsurface exploration data is representative of soil/rock and groundwater conditions across the <br />site. Considering possible underground variability of soil, rock, stockpiled material, and <br />groundwater, additional costs may be required to complete the project. We recommend that the <br />owner establish a contingency fund to cover such costs. If unexpected conditions are <br />encountered, notify ENGEO immediately to review these conditions and provide additional <br />and/or modified recommendations, as necessary. <br /> <br />The location and elevations of our borings are approximate and were estimated by pacing from <br />features shown on the Site Plan previously referenced. <br /> <br />Our services did not include excavation sloping or shoring, soil volume change factors, flood <br />potential, or a geohazard exploration. <br /> <br />This geotechnical exploration did not include work to determine the existence of possible <br />hazardous materials. If any hazardous materials are encountered during construction, then notify <br />the proper regulatory officials immediately. <br />
The URL can be used to link to this page
Your browser does not support the video tag.