My WebLink
|
Help
|
About
|
Sign Out
PC-2025-16
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2025
>
PC-2025-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2025 10:30:44 AM
Creation date
12/23/2025 10:28:35 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/23/2025
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ENGEO <br /> INCORPORATED <br /> <br /> <br />5150.100.101 <br />March 31, 2008 6 <br />Trench T-2 <br /> <br />Colluvial soils ranging from about 8 to 9 feet thick were encountered over sandstone bedrock. <br />Bedding laminations in the sandstone were oriented N30W 20E. No shearing or other features <br />indicative of faulting were observed. <br /> <br />Trench T-3 <br /> <br />From Stations 0+00 to 0+15, colluvium ranging from about 11 to 12 feet thick was encountered, <br />overlying sandstone that was similar in appearance to the sandstone encountered in Trench T-2. <br />Toward the northeast, the thickness of the colluvial deposits decreased and from about <br />Stations 0+45 to 0+52, the colluvium had been removed by a cut slope associated with <br />Dublin Canyon Road. From Stations 0+15 to 0+52, interbedded siltstone and conglomerate were <br />exposed. Bedrock structure was mapped striking N40W to N55W and dipping 20 to 40 degrees to <br />the northeast. No shearing or other features indicative of faulting were observed. <br /> <br />Based on the findings of this exploration in conjunction with the findings of previous exploration at <br />the site, the attached Geologic Cross Sections A-A’ and B-B’ (Figure 5) were prepared showing our <br />interpretation of geologic conditions at the site. The cross sections also illustrate the overlap of the <br />exploratory trenches relative to the planned building footprint. <br />
The URL can be used to link to this page
Your browser does not support the video tag.