My WebLink
|
Help
|
About
|
Sign Out
PC-2025-16
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2025
>
PC-2025-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2025 10:30:44 AM
Creation date
12/23/2025 10:28:35 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/23/2025
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Hana Japan Restaurant Project 2 <br />Mitigation Monitoring and Reporting Program May 2025 <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />Hana Japan Restaurant Project <br />Impact <br />Number Impact Mitigation Measure <br />Monitoring <br />Agency <br />Implementation <br />Schedule <br />Sign <br />-off <br />Biological Resources <br />IV (a). Would the project have a substantial <br />adverse effect, either directly or through <br />habitat modifications, on any species <br />identified as a candidate, sensitive, or <br />special status species in local or regional <br />plans, policies, or regulations, or by the <br />California Department of Fish and Wildlife or <br />U.S. Fish and Wildlife Service? <br />Western Burrowing Owl <br /> <br />IV-1. A pre-construction survey for western burrowing <br />owls shall be conducted by a qualified biologist <br />within the project site and a 100-foot buffer <br />around the project site boundaries within 14 <br />days of the commencement of construction <br />activities. Burrowing owl surveys shall be <br />conducted according to the methodologies <br />prescribed by the CDFW in their 2012 Staff <br />Report on Burrowing Owl Mitigation. In order to <br />ensure western burrowing owls do not migrate <br />into the project site following the initial survey, a <br />secondary site survey shall be conducted within <br />24 hours prior to ground disturbance. Survey <br />results shall be submitted to the Community <br />Development Department. If active burrows are <br />not detected during the surveys, further <br />mitigation shall not be required. <br /> <br /> If burrowing owls are detected on the site or <br />within 100 feet of the project site boundaries, <br />CDFW shall be contacted to determine if an <br />incidental take permit (i.e., Section 2081 permit) <br />is required due to the species being proposed <br />for listing under CESA. The following restricted <br />activity dates and setback distances are <br />(2012) or as otherwise coordinated with CDFW: <br /> <br /> From April 1 through October 15, low <br />disturbance and medium disturbance <br />activities shall have a 200-meter buffer <br />while high-disturbance activities shall <br />have a 500-meter buffer from occupied <br />nests. <br /> Between September 1st and February <br />1st, if western burrowing owls are residing <br />within the project footprint or within 200 <br /> <br /> <br />City of <br />Pleasanton <br />Community <br />Development <br />Department <br /> <br />CDFW <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Within 14 days of <br />the <br />commencement of <br />construction <br />activities and within <br />24 hours prior to <br />ground disturbing <br />activities. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.