Laserfiche WebLink
Hana Japan Restaurant Project 10 <br />Mitigation Monitoring and Reporting Program May 2025 <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />Hana Japan Restaurant Project <br />Impact <br />Number Impact Mitigation Measure <br />Monitoring <br />Agency <br />Implementation <br />Schedule <br />Sign <br />-off <br />California Health and Safety Code, Section <br />5097.98 of the California Public Resources <br />Code (PRC), and Assembly Bill 2641 shall be <br />implemented. If the County Coroner determines <br />the remains are Native American, then the <br />Coroner shall notify the Native American <br />Heritage Commission (NAHC) to designate a <br />Native American Most Likely Descendant (MLD) <br />for the project (Section 5097.98 of the PRC). <br />The designated MLD shall have 48 hours from <br />the time access to the property is granted to <br />make recommendations concerning treatment <br />of the remains. If the applicant does not agree <br />with the recommendations of the MLD, the <br />NAHC can mediate (PRC Section 5097.94). If <br />an agreement is not reached, the qualified <br />archaeologist or MLD shall rebury the remains <br />where they would not be further disturbed (PRC <br />Section 5097.98) and record the site with the <br />NAHC or the appropriate Information Center or <br />Alameda County (AB 2641). <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Geology and Soils <br />VII (c,d). <br /> <br />Would the project: <br /> <br />Be located on a geologic unit or soil that is <br />unstable, or that would become unstable as <br />a result of the project, and potentially result <br />in on- or off-site landslide, lateral spreading, <br />subsidence, liquefaction or collapse? <br /> <br />Be located on expansive soil, as defined in <br />Table 18-1B of the Uniform Building Code <br />(1994), creating substantial direct or indirect <br />risks to life or property? <br />VII-1. Prior to approval of Improvement Plans, the <br />plans shall include all relevant 2022 CBSC <br />standards, as well as all recommendations <br />included within the updated Geotechnical <br />Report (2025) and the Fault Exploration report <br />(2008) prepared by ENGEO Incorporated to <br />ensure that the recommended standards are <br />incorporated into project design and <br />construction. All project improvement plans shall <br />be reviewed by a licensed engineer and <br />approved by the City of Pleasanton Community <br />Development Department and the City <br />Engineer. <br /> <br />VII-2. Prior to commencement of building construction <br />City of <br />Pleasanton <br />Community <br />Development <br />Department <br /> <br />City Engineer <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />City of <br />Prior to approval of <br />Improvement <br />Plans. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Prior to the <br />