My WebLink
|
Help
|
About
|
Sign Out
PC-2025-24
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2025
>
PC-2025-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2025 10:38:16 AM
Creation date
12/23/2025 10:37:59 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
11/12/2025
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Page 20 <br /> <br />healthful, attractive and reasonably weed-free manner consistent with the approved <br />landscape plan, for the duration of the existence of the project. <br /> <br />60. SITE LIGHTING: All site lighting shall be designed for consistency with the <br />International Dark-Sky Association’s (IDA) Model Lighting Ordinance. This project <br />site shall be considered to be in an LZ-2 zone for design purposes. Lighting shall be <br />subject to review and approval by the City Landscape Architect prior to building <br />permit issuance. Project Specific <br /> <br />Trees <br /> <br />61. TREE REPORT: The applicant shall comply with the recommendations of the tree <br />report prepared by Brenda Wong from HortScience Bartlett Consulting dated May <br />2023. No tree trimming or pruning other than that specified in the tree report shall <br />occur. The applicant shall arrange for the Project Arborist to conduct a field <br />inspection prior to building permit issuance to ensure all recommendations have <br />been properly implemented. The Project Arborist shall certify in writing all <br />recommendations have been followed. <br /> <br />62. TREE REMOVAL MITIGATION: Any trees approved to be removed by the City shall <br />have its full value paid into the City’s Urban Forestry Fund. A credit for replanting <br />trees shall be as follows: <br /> <br />a. $250 credit for a 15-gallon size replacement tree; <br />b. $500 credit for a 24-inch box size replacement tree; and <br />c. $1,000 credit for a 36-inch box size replacement tree. <br />Project Specific <br /> <br />63. TREE DISPOSITION PLAN: Provide a tree disposition plan that shows trees to <br />remain, trees to be removed, the value of each tree, the total value of the trees to <br />remain and be protected, and the total value of trees to be removed. The plan shall <br />also include the tree protection recommendations from the arborist report. Project <br />Specific <br /> <br />64. TREE BOND: Any tree affected by development/construction must be protected per <br />the Municipal Code. The applicant shall post cash, letter of credit, or other security <br />satisfactory to the Director of Public Works, for all Heritage Trees and any other <br />significant tree as deemed by the City Landscape Architect. This bond or security will <br />be for the value of the tree(s), up to a maximum of $200,000, and shall be held for a <br />minimum of 1 year following acceptance of public improvements or completion of <br />construction, whichever is later, and shall be forfeited if the trees are destroyed or <br />substantially damaged. An arborist shall be onsite during any tree work (i.e. root <br />pruning, trimming, setting up tree protection, etc.). The bond or security may be <br />released early with a certification letter by the arborist confirming he/she was present <br />during said tree work and work was performed in accordance with the arborist’s <br />recommendations. <br />Docusign Envelope ID: 52DE2131-F0C9-4C18-86DD-6B9E7ADA8792
The URL can be used to link to this page
Your browser does not support the video tag.