My WebLink
|
Help
|
About
|
Sign Out
PC-2025-24
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2025
>
PC-2025-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2025 10:38:16 AM
Creation date
12/23/2025 10:37:59 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
11/12/2025
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Page 30 <br /> <br />of 1929 (NGVD 29) shall be converted to NAVD 88 when presented on plans. If the <br />datum is based on NGVD 29, provide a datum conversion note on all civil drawings <br />between NGVD 29 and NAVD 88. (Address this condition prior to plan approval) <br /> <br />104. SURVEY MONUMENTS FOR HORIZONTAL CONTROL. Final maps shall include <br />sufficient durable survey monuments to allow the subdivision to be retraced in <br />conformance with Pleasanton Municipal Code §19.24.220. Setting of monuments <br />shall be in accordance with California Government Code §66495-66498. The <br />surveyor shall give notice to the City Engineer when final monuments have been set, <br />and when payment for said work has been received from the subdivider. (Address this <br />condition prior to acceptance of improvements) <br /> <br />105. STORMWATER HYDRAULICS. The City’s storm drainage network has been <br />designed in accordance with the Alameda County Hydrology and Hydraulics Manual <br />published by the Alameda County Flood Control & Water Conservation District. Said <br />manual is available for download at: <br /> <br /> https://acfloodcontrol.org/the-work-we-do/the-work-we-do-hydrology-manual/ <br /> <br /> The City is located in Zone 7, and its storm drain pipe network is considered a <br />secondary facility. Any connections to, additions, or upgrades to the City’s pipe <br />network shall be designed in accordance with the manual. Calculations submitted for <br />review/approval shall be presented in a format consistent with the “Calculation Form – <br />District Rational Method” available in the manual. The calculations shall demonstrate <br />adequate freeboard given the design storm event assuming all bioretention areas are <br />overflowing. Said calculations shall be prepared, stamped, and signed by a <br />California-licensed civil engineer. (Address this condition prior to plan approval) <br /> <br />106. POTABLE WATER SYSTEM DESIGN STANDARDS. All permanent connections to <br />the City’s potable water network shall conform to Pleasanton Municipal Code <br />§14.04.050. Any required water pressure and/or flow needed by the applicant beyond <br />that available from the network at the point-of-connection must be provided by the <br />applicant as a private improvement on the customer side of the meter or backflow <br />prevention device. All extensions or upgrades to the potable water network shall be <br />designed to satisfy the following minimum standards: <br /> <br />a. Minimum pressures: <br /> <br />I. 40 psi (peak hour demand) <br />II. 20 psi (maximum day demand plus fire flows) <br />(Address this condition prior to plan approval) <br /> <br />Docusign Envelope ID: 52DE2131-F0C9-4C18-86DD-6B9E7ADA8792
The URL can be used to link to this page
Your browser does not support the video tag.