My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
110425 REGULAR
>
CITY COUNCIL MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2025 1:05:40 PM
Creation date
12/26/2025 1:02:18 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/4/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Element 4 – Operations and Maintenance Program <br />City of Pleasanton Sewer System Management Plan, July 2025 19 <br />4.2.1: Gravity Mains <br />Cleaning: Sewer collection systems require continuous maintenance to ensure proper <br />function/performance. In addition to common maintenance defects (roots, debris, grease, etc.), <br />items not intended for the sewer system (non-dispersible wipes, kitty litter, floss, etc.) can be <br />introduced at any time, which makes regular cleaning a high priority. Gravity mains will be <br />cleaned on a 7-year frequency cycle and in a systematic manner to ensure flow efficiency. <br />Gravity main segments will be cleaned from the downstream manhole to the upstream <br />manhole whenever possible. Exceptions can be made in some cases: (1) there are no lateral <br />connections on the gravity main being cleaned, or (2) a forward-cleaning nozzle is being used. <br />The City will primarily use in-house resources to perform cleaning for piping 15-inch and <br />smaller. However, until a resource study is completed (see Section 4.5) and needed employees <br />are identified and hired, contract services will be used to supplement staff. For large diameter <br />sewers (greater than 15-inch diameter) and siphons, all cleaning will be performed by contract <br />services. <br />Inspection: CCTV inspection of gravity mains will follow cleaning and occur on a 7-year <br />frequency cycle. The City will primarily use in-house resources to perform inspection for <br />piping 15-inch and smaller. However, until a resource study is completed (see Section 4.5) <br />and needed employees are identified and hired, contract services will be used to supplement <br />staff. For large diameter sewers (greater than 15-inch diameter) and siphons, all inspections <br />will be performed by contract services. CCTV inspections are intended to evaluate system <br />performance and drive much of the maintenance and repair activities needed to properly <br />operate the sewer collection system. Defects and other findings will be coded using the <br />National Association of Sewer Service Companies (NASSCO), Pipeline Assessment <br />Certification Program (PACP) and Pioneer software. <br />CCTV inspections will also occur as a follow-up to SSOs to determine the cause of the SSO <br />and to ensure the affected pipe is performing adequately. This inspection will be performed as <br />soon as possible after the SSO event. This inspection will be used to verify findings when <br />reporting to CIWQS and will help determine maintenance and repair activities to prevent <br />reoccurrence of the SSO. <br />Hot Spots: The City keeps a hot spot list, which are sewer pipe segments that have been <br />identified by staff as requiring high frequency cleaning. When placed on the hot spot list, the <br />pipe segment is assigned a maintenance frequency (i.e., monthly, quarterly, biannually, <br />annually, etc.) and maintenance method (i.e., appropriate nozzle type). The pipe segment is <br />also evaluated for feasibility, cost, and benefit of repair to determine if and when is the most <br />appropriate time to implement improvements and remove the segment from the hot spot list. <br />Root Control: Gravity main segments to be included in the root control program are generally <br />informed by the results of the cleaning and inspection program. Gravity main segments that <br />Page 274 of 323
The URL can be used to link to this page
Your browser does not support the video tag.