Laserfiche WebLink
5 <br />Gravity System Condition Assessment <br />Rehab and <br />repair decisions <br />are based on <br />defect codes <br />During CCTV, every <br />defect is given a <br />standardized code <br />30% of system <br />had CCTV <br />data available <br />Gravity System Condition Assessment <br />Total Cost <br />Cost of Pipe R/R Decisions1 <br />Risk Priority <br />Rating Estimated CCTV <br />Cost2 <br />Defect Point <br />Repair <br />Point Repair <br />and LineLineReplace <br />$ 945,000 $ 119,000 $ 298,000 $ 298,000 -$ 230,000 High <br />$ 5,005,000 $ 366,000 $ 3,527,000 $ 448,000 $ 462,000 $ 202,000 Medium <br />$ 1,195,000 $ 707,000 $ 488,000 ---Low <br />$ 5,206,000 $ 4,962,000 $ 244,000 ---Very Low <br />$ 12,362,000 $ 6,154,000 $ 4,557,000 $ 757,000 $ 462,000 $ 432,000 Total Pipes <br />Total <br />Length <br />(LF)1 <br />Number of Pipes <br />Risk <br />Priority <br />Rating TotalNormal PM <br />Pipes that <br />Require <br />CCTV Data <br />Defect <br />Point <br />Repair <br />Point <br />Repair and <br />Line <br />LineReplace <br />18,80074105732-2High <br />77,6004027427439582Medium <br />100,700448194245---Low <br />1,138,0005,7391,6554,0813---Very Low <br />1,334,3006,6631,7584,83650784Total Pipes <br />1,334,300404,900910,80014,8001,8001,700600 <br />Total <br />Length <br />(LF)1 <br />Page 318 of 323