My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
111825 REGULAR
>
CITY COUNCIL MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2025 1:59:45 PM
Creation date
12/26/2025 1:52:06 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/18/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dublin/Pleasanton BART Existing Conditions – Access and Circulation <br />June 6, 2025 <br />Page 23 of 24 <br /> <br />Valley Link <br />Valley Link is a planned 42-mile rail corridor that will connect the Tri-Valley region to the <br />Northern San Joaquin Valley, serving the cities of Livermore, Tracy, and Stockton. The project is <br />intended to expand regional connectivity, reduce congestion on I -580, and provide a sustainable <br />alternative to long car commutes between inland communities and the Bay Area. The west <br />terminus of the service would be at the Dublin/Pleasanton Station, which would serve as a <br />transfer point between Valley Link and BART. Figure 11 shows the location of the raised platform <br />on the Pleasanton side of the station above the Hewlett Canal. The project is currently in the <br />design and environmental clearance phase with construction expected in 2028. <br /> <br />DRA <br />F <br />T <br />Page 309 of 399
The URL can be used to link to this page
Your browser does not support the video tag.