My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
120225 REGULAR
>
CITY COUNCIL MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2025 2:05:09 PM
Creation date
12/26/2025 2:03:27 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/2/2025
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 of 6 <br />Planned Unit Development Major Modification <br />As described in Attachment 2, all of the findings for approval for the PUD Major Modification <br />can be made, including finding that the proposed plan is in the best interest of the public <br />health, safety, and general welfare, the proposal is compatible with the previously developed <br />properties in the vicinity and the natural, topographic features of the site, and adequate public <br />safety measures have been incorporated into the design. <br /> <br />ENVIRONMENTAL ASSESSMENT <br />The project is within the scope of the Vineyard Avenue Corridor Specific Plan (VACSP) <br />Environmental Impact Report (EIR). No additional environmental review is required under the <br />California Environmental Quality Act (CEQA) Section 15162 because no substantial changes <br />to the Planned Unit Development (PUD) are proposed, no substantial changes have occurred <br />with respect to the circumstances under which the project is undertaken, and no new <br />information of substantial importance shows that the project will have one or more significant <br />effects not discussed in the previous EIR. <br /> <br />PLANNING COMMISSION ACTION <br />The Planning Commission held a public hearing on September 26, 2025, to review and <br />provide a recommendation to the City Council on the proposed actions. The Planning <br />Commission unanimously recommended approval to the City Council, based on the project’s <br />conformance with the PUD findings, the General Plan, and the VASCP, as amended. <br /> <br />EQUITY AND SUSTAINABILITY <br />This action creates more equity in the approval process for gates within the Vineyard Avenue <br />Corridor Specific Plan area in that it creates criteria for assessment. Allowing the CEDD <br />Director or their designee to evaluate gate installations ensures case-by-case oversight, <br />preventing inequitable outcomes—such as gates that might restrict public access or create <br />social or physical barriers between neighborhoods. <br /> <br />OUTREACH <br />Notification of this project has been published in The Valley Times as an upcoming agenda <br />item for the December 2, 2025, City Council meeting. Additionally, notices of this application <br />were sent to surrounding property owners and tenants within a 1,000-foot radius of the site. At <br />the time this report was prepared, no public comments were received by staff. <br /> <br />STRATEGIC PLAN ALIGNMENT <br />Approval of this action advances the strategic goal of Building a Community Where Everyone <br />Belongs of the ONE Pleasanton Strategic Plan in that allowing reasonable modifications—like <br />gate installations under guided oversight—supports the neighborhood's sense of safety, which <br />can enhance residents’ sense of confidence in their community’s upkeep and stability. <br /> <br />FISCAL IMPACT <br />There is no direct fiscal impact associated with the proposed action. <br /> <br /> <br /> <br /> <br />Page 16 of 200
The URL can be used to link to this page
Your browser does not support the video tag.