My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
120225 REGULAR
>
CITY COUNCIL MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2025 2:05:09 PM
Creation date
12/26/2025 2:03:27 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/2/2025
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P25-0352, PMC Amendments Planning Commission <br />2 of 9 <br />• PMC Chapter 18.144 (appeals): Modifying the appeal period and clarifying appeal <br />procedures. <br />• Other amendments throughout PMC Title 18 to align with the comprehensive overhauls <br />noted above and clean up the Code. <br /> <br />BACKGROUND <br />In recent years, growing concerns have been raised by City Council members, Planning <br />Commissioners, and the public that the City’s current application review processes are <br />burdensome and not user-friendly. On July 15, 2025, the City Council conducted a workshop <br />to identify its top priorities for the next two Fiscal Years. This direction was affirmed at the City <br />Council’s August 19, 2025, meeting to include, as a priority project, amending the Pleasanton <br />Municipal Code and improving processes to simplify permitting, reduce delays, streamline <br />Design Review, and support business and retail attraction. Further, during the City Council <br />budget discussions this past year, it was identified that the City would be making a series of <br />budget reductions, including to “Internal Services and Operational Support.” With that <br />reduction, it was stated that the City will return to a more limited neighborhood notice <br />requirement, aligned to the requirements of the Government Code rather than the City’s <br />current, very expansive, noticing procedures. <br /> <br />Based on this direction, staff conducted a review and analysis of two key areas for potential <br />improvement: 1) the Design Review process, and 2) the PMC’s noticing, appeals, and call-up <br />procedures more generally. These areas were selected as a priority for assessment because <br />Design Review applications are the most common type of application processed by the City, <br />and, in staff’s observation and experience, the noticing and appeals procedures are a main <br />cause of delays and extended timeframes in project processing. <br /> <br />Permit Types <br />Almost all projects involving physical changes to property require some form of City permit or <br />approval. At a basic level, City approvals include building permits, planning permits, or both. <br />Some of the key elements distinguishing these approvals are outlined below: <br /> <br />Building Permits: <br />• Typically, non-discretionary or “ministerial” in nature <br />• Applications are submitted digitally to the City’s Building & Safety Division, which then <br />routes the permit for review to all necessary City divisions (e.g., Fire, Engineering/Land <br />Development, Planning, Landscape Architecture, and Traffic). <br />• Review limited to evaluation for compliance with respective codes, policies, and <br />adopted plans, typically based on objective standards (e.g., setbacks, height <br />requirements; City-adopted public works standards; parking and traffic thresholds, <br />Building and Fire Codes). <br />• Public noticing is not required. <br /> <br />Planning Permits: <br />• Typically discretionary in nature, with approval based on compliance with PMC- <br />specified findings or criteria. <br />• Planning approval must be secured prior to occupancy and before a project can be <br />submitted to the Building & Safety Division for Building Permits. The approval process <br />varies by permit type, but may be either “administrative” (where the approval body is the <br />Page 169 of 200
The URL can be used to link to this page
Your browser does not support the video tag.