My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
121625 REGULAR
>
CITY COUNCIL MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2025 2:12:17 PM
Creation date
12/26/2025 2:09:53 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/16/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance No. 2302 <br />Page 6 of 11 <br /> <br /> <br />plan sheets of all building permit and engineering permit plan submittals for <br />review by the City prior to issuance of permits. <br /> <br />4. APPEAL PERIOD: The building permit submittal will only be accepted after <br />completion of the appeal period provided in the Municipal Code unless the <br />applicant submits a signed statement acknowledging the plan check fees may be <br />forfeited in the event the approval is overturned on appeal, or the design is <br />significantly changed as a result of the appeal. In no case will a building permit <br />be issued prior to the expiration of the appeal period. <br /> <br />5. PUD PERIOD: The building permit submittal will only be accepted after the <br />ordinance approving the Planned Unit Development (PUD) development plan <br />becomes effective, unless the applicant submits a signed statement <br />acknowledging the plan check fees may be forfeited in the event the ordinance is <br />overturned. In no case will a building permit be issued prior to the PUD ordinance <br />amendment being in effect. <br /> <br />6. LIABILITY AND INDEMNIFICATION: To the extent permitted by law, the project <br />applicant shall hold harmless, defend (with counsel acceptable to the City), and <br />indemnify the City, its City Council, its officers, commissions, employee and <br />agents from and against any claim, action, or proceeding brought by a third party <br />against the indemnified parties and/or the applicant to attack, set aside, or void <br />the approval of the project or any permit authorized hereby for the project, <br />including without limitation, reimbursing the City its attorneys’ fees and costs <br />incurred in defense of the litigation. The City may, in its sole discretion, elect to <br />defend any such action with attorneys of its choice. <br /> <br />PLANNING DIVISION – 925-931-5600 <br /> <br />7. KEYPAD LOCATION: The keypad shall be positioned where a driver can <br />easily reach the controls without their vehicle obstructing trail users and <br />without their vehicle positioned within the gate swing area. Further, exiting <br />vehicles must pause at the STOP control and wait if trail users are present. <br />The swing of the gate could potentially impact a vehicle stopped at the <br />intersection. The application shall indicate how these conflicts will be <br />addressed prior to issuance of Building Permit. <br />8. FINAL INSPECTION: Final inspection by the Planning Division is required prior <br />to Building Permit Final. <br /> <br />9. CULTURAL RESOURCES/HUMAN REMAINS: If any prehistoric or historic <br />artifacts, or other indication of cultural resources are found once the project <br />construction is underway, all work shall stop within 20-meters (66 feet) of the <br />find. A qualified archaeologist shall be consulted for an immediate evaluation of <br />the find prior to resuming groundbreaking construction activities within 20 meters <br />of the find. If the find is determined to be an important archaeological resource, <br />the resource shall be either avoided, if feasible, or recovered consistent with the <br />Page 19 of 373
The URL can be used to link to this page
Your browser does not support the video tag.