My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
121625 REGULAR
>
CITY COUNCIL MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2025 2:12:17 PM
Creation date
12/26/2025 2:09:53 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/16/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 4 <br />Park and Palo Alto. Their project team includes staff with direct experience on numerous <br />similar design projects, including at-grade crossing design, and liaison with key regulatory <br />agencies and other stakeholders. Please see Attachment 1 for details of the Kimley-Horn team <br />qualifications and experience. <br /> <br />DISCUSSION <br />Implementation of a quiet zone is a multistep process that involves consultation and <br />coordination with various agency and other stakeholders, including the Federal Railroad <br />Administration, Union Pacific Railroad, Altamont Commuter Express, and the City. Each <br />stakeholder will need to express their support for the Quiet Zone Plan prior to its <br />implementation. The scope of work includes support for broader public engagement in the form <br />of a general public outreach meeting, as well as at least one City Council meeting. <br /> <br />The process will include six major tasks: <br />1. Quiet Zone Preliminary Analysis <br />2. Concept Development (15 percent design) <br />3. Stakeholder Engagement <br />4. City Council Review and Approval of Design Concept <br />5. Final Design <br />6. Permitting and Approvals <br /> <br />The details of each of these tasks are outlined in the proposal, included as Exhibit A of <br />Attachment 1. A key decision-point will be the City Council Review of the Design Concept, <br />which, depending on the scope of the improvements and their costs, may require consideration <br />of additional funding to support project implementation. The scope encompasses design <br />services with the assumption that improvements will be small-scale improvements (installation <br />of medians or other typical Civil designs). If more extensive improvements are needed, such <br />as those requiring modifications to the train control or communication systems (examples <br />include: additional railroad crossing arms or pedestrian warning systems), the design of these <br />more complex improvements would require additional funding and a separate approval. <br />Construction costs are not part of this proposal and would also require separate approval. <br /> <br />Schedule <br />Kimley-Horn’s proposal outlines an approximately 21-month timeline to reach the final goal of <br />establishing the Quiet Zone (i.e. implementation/construction of recommended <br />improvements). <br /> <br />January 2026-March <br />2026 <br />1. Quiet Zone Preliminary Analysis <br />March 2026-July <br />2026 <br />2. Concept Development (15 percent design) <br />March 2026-July <br />2026 <br />3. Stakeholder Engagement <br />July 2026 4. City Council Review of Design Concept <br />Page 46 of 373
The URL can be used to link to this page
Your browser does not support the video tag.