My WebLink
|
Help
|
About
|
Sign Out
O'GRADY PAVING, INC. (#2026362)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
O
>
O'GRADY PAVING, INC. (#2026362)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2026 11:17:46 AM
Creation date
12/30/2025 11:08:45 AM
Metadata
Fields
Template:
CONTRACTS
Description Type
As-Needed Agreement for Maintenance or Trade
Contract Type
New
NAME
O'GRADY PAVING, INC.
Contract Record Series
704-05
Munis Contract #
2026362
Contract Expiration
6/30/2026
NOTES
ANNUAL STREET RESURFACING PROJECT #25503 FOR FISCAL YR 2025/26
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date: <br />To : <br />T hrou gh: <br />From: <br />Su bj ect: <br />PLEASANTON . <br />MEMORANDUM <br />September 16 , 2025 <br />Mayor Jack Balch and Members of the City Council <br />Gerry Beaudin, City Manager <br />Siew-Chin Yeong , Director of Public Work~~ <br />Adam Nelkie , Assistant Director of Public Works , City Engineer <br />Request to Amend Recommendations to increase project costs to $650 ,00 for Council <br />Item #14 on Emergency Sewer Pipe Replacement at Denker Drive on September 16 , <br />2025 , Council Meeting <br />During the emergency sewer line repair on Denker Drive and Inglewood Drive , the contractor <br />encountered large underground voids outside of the initial failed sections . These voids , caused by soil <br />loss through the failed sewer line , created unstable trench conditions that required additional <br />excavation and expanded pavement restoration than was estimated. <br />The work was performed on a time-and -materials basis , and the initial pricing received from DPI <br />Construction , Inc. indicates that project costs will exceed the previously estimated $500 ,000 . <br />Staff recommend increasing the total project budget from $500 ,000 to $650 ,000 to cover all costs <br />incurred. Sufficient funding is available in the Sewer Replacement CIP to support the additional <br />$150 ,000. <br />REC OMMENDATI O N <br />1. Ratify a contract with DPI Construction, Inc . in the not-to -exceed amount of $650 ,000 for the <br />emergency sewer pipe replacement at Denker Drive . <br />2 . Approve the creation of the Capital Improvement Program project, Denker Drive Emergency Sewer <br />Repairs , CIP No . 26203 , to the approved 5-year CIP for FY 2025/26 , and the budget amendment to <br />appropriate $650 ,000 from the Sewer Replacement CIP (Fund 431). <br />Docusign Envelope ID: 5619FDA5-F294-4609-A6B6-614BED03B25C
The URL can be used to link to this page
Your browser does not support the video tag.