My WebLink
|
Help
|
About
|
Sign Out
Planning Commission Meeting Agenda Packet (2)
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
05-14
>
Planning Commission Meeting Agenda Packet (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2025 3:16:17 PM
Creation date
12/30/2025 3:10:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
P24-0420 and P24-0421 PC-2025-10, May 14, 2025 <br />application; or the site is occupied if no building permit or certificate of occupancy is <br />required; or the applicant or his/her successor has filed a request for extension with the <br />Zoning Administrator pursuant to the provisions of the Pleasanton Municipal Code. <br />(Project Specific Condition) <br />3.CONDITIONS OF APPROVAL CHECKLIST: The applicant shall submit a “Conditions of <br />Approval Checklist” indicating all conditions in Exhibit A have been satisfied, <br />incorporated into the building permit plans or improvements plans, and/or addressed. <br />Said checklist shall be incorporated as one of the first four plan sheets of all building <br />permit and engineering permit plan submittals for review by the City prior to issuance of <br />permits. <br />4.APPEAL PERIOD: The building permit submittal will only be accepted after completion <br />of the appeal period provided in the Municipal Code unless the applicant submits a <br />signed statement acknowledging the plan check fees may be forfeited in the event the <br />approval is overturned on appeal, or the design is significantly changed as a result of <br />the appeal. In no case will a building permit be issued prior to the expiration of the <br />appeal period. <br />5.LIABILITY AND INDEMNIFICATION: To the extent permitted by law, the project <br />applicant shall hold harmless, defend (with counsel acceptable to the City), and <br />indemnify the City, its City Council, its officers, commissions, employee and agents from <br />and against any claim, action, or proceeding brought by a third party against the <br />indemnified parties and/or the applicant to attack, set aside, or void the approval of the <br />project or any permit authorized hereby for the project, including without limitation, <br />reimbursing the City its attorneys’ fees and costs incurred in defense of the litigation. <br />The City may, in its sole discretion, elect to defend any such action with attorneys of its <br />choice. <br />PLANNING DIVISION – 925-931-5600 <br />Conditional Use Permits <br />6.DEPARTMENT OF ALCOHOLIC BEVERAGE CONTROL: The applicant shall obtain <br />all necessary approvals from the Department of Alcoholic Beverage Control (ABC) <br />prior to operation. (Project Specific Condition) <br />7.INDOOR/OUTDOOR ENTERTAINMENT AND MUSIC: Indoor/outdoor entertainment <br />and lightly amplified music shall be permitted pursuant to compliance with the City’s <br />Noise Ordinance. (Project Specific Condition) <br />8.DOORS: Self-closing door mechanisms shall be installed on all exterior doors. The <br />applicant shall keep all exterior doors of the building closed when not being used for <br />ingress/egress purposes to the extent possible to the satisfaction of the Director of <br />Community Development. (Project Specific Condition)
The URL can be used to link to this page
Your browser does not support the video tag.