My WebLink
|
Help
|
About
|
Sign Out
Planning Commission Meeting Agenda Packet (2)
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
05-14
>
Planning Commission Meeting Agenda Packet (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2025 3:16:17 PM
Creation date
12/30/2025 3:10:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />P24-0420 and P24-0421 PC-2025-10, May 14, 2025 <br /> <br />95. WATER EFFICIENT LANDSCAPE ORDINANCE (WELO): The project shall comply with <br />the City of Pleasanton’s Water Efficient Landscape Ordinance (WELO) and Bay <br />Friendly Basics Landscape Checklist. The applicant shall submit a Landscape <br />Documentation Package in PDF format to the Landscape Architecture Division, which <br />shall be subject to review and approval by the City Landscape Architect prior to building <br />permit issuance. The Landscape Documentation Package shall include: <br /> <br />a. Project Information; <br />b. Water Efficient Landscape Worksheet; <br />c. Soil management report; <br />d. Landscape design plan; <br />e. Irrigation design plan; and <br />f. Grading design plan. <br /> <br />96. CERTIFICATE OF COMPLETION: Upon completion of construction and prior to final <br />inspection by the Building and Safety Division, the applicant’s landscape architect shall <br />submit a Certificate of Completion Package in PDF format to the Landscape <br />Architecture Division for review and approval. The Certificate of Completion Package <br />shall include: <br /> <br />a. Project information sheet; <br />b. Certificate of installation according to the landscape documentation package; <br />c. Irrigation scheduling; <br />d. Schedule of irrigation, landscape and irrigation maintenance; <br />e. Landscape irrigation audit report; and <br />f. Soil management report (if not previously submitted). <br /> <br />97. LANDSCAPING INSTALLATION: Prior to building permit final all landscaping shall be <br />installed as shown on the approved building permit set and shall be inspected and <br />approved by the Landscape Architecture Division. <br /> <br />98. CONCRETE CURBS: 6-inch vertical concrete curbs, with curb cuts or flush curbs with <br />wheel stops, if determined to be acceptable by the Director of Engineering/City <br />Engineer and Director of Community Development, shall be installed between all paved <br />and landscape areas, in conformance with the City’s Standard Specifications and <br />Details. <br /> <br />99. EROSION CONTROL: For purposes of erosion control, the applicant shall plant a hydro <br />seed mixture designed by the applicant’s landscape architect and approved by the <br />Landscape Architecture Division prior to installation. The erosion control shall be <br />maintained by the applicant until permanent landscaping is in place. <br /> <br />100. BACKFLOW AND IRRIGATION METER SCREENING: All backflow prevention devices <br />and above ground irrigation controls shall be located and screened to minimize their <br />visual impacts. These devices with their proposed screening shall be shown on the <br />landscaping and utility plans submitted with the building permit plans or improvement <br />plans and shall be subject to the review and approval of the City Landscape Architect
The URL can be used to link to this page
Your browser does not support the video tag.