My WebLink
|
Help
|
About
|
Sign Out
Planning Commission Meeting Agenda Packet (2)
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
05-14
>
Planning Commission Meeting Agenda Packet (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2025 3:16:17 PM
Creation date
12/30/2025 3:10:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FINISH GRADE <br />0" <br />BO ROOF <br />21' - 6" <br />B C E FD <br />HIGH ROOF <br />34' - 1 1/16" <br />2 <br />A-3.2 <br />10.0510.03 <br />MT-1 MT-3 MT-1 MT-2PT-1 PT-1PT-3MT-4 <br />PT-3 <br />08.0408.04 08.05 08.06 <br />MT-3 <br />08.04 05.0205.02 <br />CM-1 <br />26.01 <br />3 <br />A-3.2 <br />PT-3 <br />TO WALL <br />10' - 0" <br />PT-2PT-2PT-2 <br />08.03 08.03 <br />PT-4 <br />22.02 <br />PT-4MT-6 <br />PT-3 <br />03.03 <br />MT-7 <br />A D.5 <br />07.0007.00 32.08 <br />G <br />3 <br />A-4.2 <br />3 <br />A-4.1 <br />1 <br />A-4.1 <br />4 <br />A-4.1 <br />TO TILE <br />5' - 0" <br />FINISH GRADE <br />0" <br />BO ROOF <br />21' - 6" <br />52 <br />HIGH ROOF <br />34' - 1 1/16" <br />1 <br />A-3.2 <br />MT-2MT-1 MT-3 <br />08.00 10.03 10.04 <br />PT-1MT-4 <br />PT-3 <br />PT-1 MT-1 <br />08.0010.05 03.0308.06 08.06 08.06 <br />4 <br />A-3.2 <br />PT-3 <br />4 <br />A-4.2 <br />TO WALL <br />10' - 0" <br />05.0208.06 <br />6143.5 <br />32.08 <br />3 <br />A-5.1 <br />3 <br />TO TILE <br />5' - 0" <br />FINISH GRADE <br />0" <br />BO ROOF <br />21' - 6" <br />5 2 <br />HIGH ROOF <br />34' - 1 1/16" <br />1 <br />A-3.2 <br />08.01 08.02 <br />MT-1 PT-2PT-2 <br />10.05 <br />MT-7 PT-4 PT-3CM-1PT-2 <br />PT-2 <br />26.01 <br />4 <br />A-3.2 <br />MT-4 <br />PT-3 <br />MT-4 <br />PT-3 <br />MT-4 <br />PT-3 <br />PT-4 <br />TO WALL <br />10' - 0" <br />08.0208.0208.02 <br />MT-3 PT-4 PT-4MT-6 <br />PT-3 <br />03.03 <br />MT-1 <br />6 143.5 3 <br />TO TILE <br />5' - 0" <br />FINISH GRADE <br />0" <br />BO ROOF <br />21' - 6" <br />BCEFD <br />HIGH ROOF <br />34' - 1 1/16" <br />2 <br />A-3.2 <br />10.03 08.02 <br />MT-3 MT-5 MT-1 PT-2ST-1ST-1PT-3 PT-1PT-1 <br />05.02 <br />CM-1 <br />PT-2 <br />3 <br />A-3.2 <br />TO WALL <br />10' - 0" <br />08.00 <br />MT-2 <br />PT-3 <br />MT-5 <br />PT-3 <br />MT-6 <br />PT-3 <br />MT-7 <br />AD.5 <br />07.0007.0032.08 <br />G 3 <br />A-4.2 <br />3 <br />A-4.1 <br />1 <br />A-4.1 <br />4 <br />A-4.1 <br />TO TILE <br />5' - 0" <br />ISSUANCE & REVISIONS <br />All drawings and written material appearing herein constitute the <br />original and unpublished work of the architect and the same may <br />not be duplicated, used, or disclosed without the written consent of <br />the architect © Field Paoli <br />SHEET NUMBER: <br />JOB NO. <br />CHECKED BY <br />DRAWN BY <br />NOT FOR CONSTRUCTION <br />3/ <br />1 <br />4 <br />/ <br />2 <br />0 <br />2 <br />5 <br /> <br />1 <br />1 <br />: <br />4 <br />2 <br />: <br />2 <br />5 <br /> <br />A <br />M <br />A-3.1 <br />CONSTRUCTION DOCUMENTS <br />2348 <br />NCE / AFC <br />WL / CS <br />BUILDING EXTERIOR ELEVATIONS <br />1/8" = 1'-0"A-3.1 <br />1 BUILDING ELEVATION - WEST <br />1/8" = 1'-0"A-3.1 <br />4 BUILDING ELEVATION - SOUTH <br />1/8" = 1'-0"A-3.1 <br />2 BUILDING ELEVATION - NORTH <br />1/8" = 1'-0"A-3.1 <br />3 BUILDING ELEVATION - EAST <br />KEYNOTES <br />TAG MATERIAL MANUFACTURER FINISH NOTES <br />CM-1 CMU SMOOTH FINISH, INTEGRAL LIGHT COOL GRAY <br />COLOR <br />MT-1 PREFINISHED METAL SIDING PANEL SYSTEM DARK GRAY FINISH PREMANUFACTURED <br />MT-2 PREFINISHED METAL SIDING PANEL SYSTEM LIGHT GRAY FINISH PREMANUFACTURED <br />MT-3 PREFINISHED METAL PANEL ROOF SYSTEM DARK GRAY FINISH PREMANUFACTURED; BATT INSULATION WITH LINER AT INTERIOR SURFACE <br />MT-4 STEEL CANOPY <br />MT-5 CORRUGATED METAL <br />MT-6 ROOFTOP EQUIPMENT SCREEN <br />MT-7 METAL FLASHING <br />PT-1 EXTERIOR PAINT FINISH DARK GRAY- BLACK <br />PT-2 EXTERIOR PAINT FINISH DARK WARM GRAY FINISH TO MATCH MT-1 <br />PT-3 EXTERIOR PAINT FINISH DARK BLACK GRAY FINISH <br />PT-4 EXTERIOR PAINT FINISH LIGHT COOL GRAY TO MATCH CMU-1 <br />ST-1 STOREFRONT KAWNEER DARK BRONZE <br />03.03 EXPOSED CONCRETE CURB <br />05.02 PRE-ENGINEERED BUILDING PRIMARY STEEL GABLE FRAME WITH TAPERED COLUMNS/ BEAMS, SSBD <br />07.00 GUTTER AND DOWNSPOUT <br />08.00 ALUMINUM STOREFRONT SYSTEM WITH GLASS ENTRY DOOR, DARK BRONZE FINISH <br />08.01 OVERHEAD ROLL-UP INSULATED DOOR <br />08.02 HOLLOW METAL DOOR & FRAME <br />08.03 ELECTRICAL ALCOVE/MPOE ROOM HOLLOW METAL DOORS <br />08.04 ALUMINUM STOREFRONT WINDOW SYSTEM, DARK BRONZE FINISH <br />08.05 <br />08.06 VERTICAL LIFT DOOR SYSTEM WITH TRANSOM ABOVE <br />10.03 AREA FOR TENANT SIGNAGE GRAPHIC <br />10.04 AREA FOR ILLUMINATED TENANT SIGNAGE BY OTHERS, PROVIDE BACKING <br />10.05 PREFINISHED METAL SOLAR SHADE <br />22.02 GAS METER, SEE PLUMBING DRAWINGS. <br />23.01 GLYCOL CHILLER - PRIMARY, SEE BREWERY EQUIPMENT DRAWINGS. <br />26.01 TRANSFORMER, SEE ELCTRICAL DRAWINGS. <br />26.02 STEAM GENERATOR, SEE BREWERY EQUIPMENT DRAWINGS. <br />32.08 POTENTIAL ON-SITE FOOD TRUCK CONTAINER TRAILER LOCATION WITH UTILITY SERVICE PROVIDED. <br />NO. DESCRIPTION DATE <br />DESIGN REVIEW SUBMITTAL 07.17.2024 <br />1 DESIGN REVIEW RESUBMITTAL 09.13.2024 <br />2 DESIGN REVIEW RESUBMITTAL 02.07.2025
The URL can be used to link to this page
Your browser does not support the video tag.