Laserfiche WebLink
37 City of Pleasanton Capital Improvement Program • FY 2025/26 - FY 2029/30 <br />The WLP Boulevard corridor from Hopyard to Santa <br />Rita Road is identified in the 2018 Pedestrian Bicycle <br />Master Plan as the highest-priority corridor. This proj- <br />ect will be funded from grants from Alameda CTC <br />and Measure BB Bike and Pedestrian funding. This <br />project is in alignment with the ONE Pleasanton Stra- <br />tegic Plan goal of - Investing in Our Environment to <br />invest in parks, bicycle, and pedestrian infrastructure. <br />West Las Positas Boulevard <br />Multimodal Reconstruction - <br />Owens Drive to Santa Rita Road <br />Project Number: 26514 <br />Transportation <br />This project will focus on West Las Positas (WLP) Bou- <br />levard between Owens Drive and Santa Rita Road, <br />specifically the design phase for the reconstruction or <br />replacement of portions of the roadway and sidewalk. <br />It will also include pedestrian, bicycle, and transit <br />improvements to bring the corridor up to an ‘all users <br />and abilities’ design standard. This funding will sup- <br />port the project design. <br />Department: <br />Project Phase: Design <br />Total Budget:$1,000,000 <br />Project Description: <br />CIP Rating Score:98 <br />Project Funding <br />Project Justification: <br />Fund Description Fund #Current <br />Funding FY 2025/26 FY 2026/27 FY 2027/28 FY 2028/29 FY 2029/30 <br />Miscellaneous <br />CIP Grants 162 - $750,000 ---- <br />Measure BB - <br />Bike & Pedestrian 165 -$250,000 ---- <br />Community & Economic <br />Development -Traffic Engineering