My WebLink
|
Help
|
About
|
Sign Out
Agenda Packet (7)
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
05-28
>
Agenda Packet (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2025 3:27:07 PM
Creation date
12/30/2025 3:19:26 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
75 City of Pleasanton Capital Improvement Program • FY 2025/26 - FY 2029/30 <br />The 2024 Sanitary Sewer System Capacity Evalua- <br />tion Report identified potential sewer overflows due <br />to insufficient capacity of the existing sewer main. <br />The project will increase capacity of the system. <br />Bernal Avenue Sewer Improvements - <br />Tawny Drive to Nevada Street <br />Project Number: 29299 <br />Sewer <br />This project upsizes 3,000 linear feet of 10-inch sewer <br />pipe to 12-inch in Bernal Avenue, and will connect the <br />sewer system in Bernal Avenue to the existing 18-inch <br />sewer in Nevada Street via a new 12 inch pipe bridge <br />crossing over Arroyo Del Valle. <br />Department: <br />Project Phase: Design & Construction <br />Total Budget:$3,330,000 <br />Project Description: <br />CIP Rating Score:Enterprise <br />Project Funding <br />Project Justification: <br />Fund Description Fund #Current <br />Funding FY 2025/26 FY 2026/27 FY 2027/28 FY 2028/29 FY 2029/30 <br />Sewer Replace- <br />ment CIP 431 ----$400,000 $2,930,000 <br />Public Works - <br />Utilities & Environmental Services
The URL can be used to link to this page
Your browser does not support the video tag.