Laserfiche WebLink
City of Pleasanton Capital Improvement Program • FY 2025/26 - FY 2029/30 84 <br />There is an ongoing need to perform repairs or re- <br />medial measures to prevent or limit storm damage <br />and improve storm water quality. Recent elevated <br />rain runoff flows have significantly impacted the <br />storm water system infrastructure. <br />Annual Storm Repair & Replacement <br />Project Number: FY615 <br />Storm Drain <br />This project will provide erosion control and other <br />storm protection measures for City-owned property. <br />The project includes the repair, replacement, or in- <br />stallation of new storm facilities to protect property <br />from damage associated with storm activity, improve <br />storm water quality, and reduce the work required <br />to safely remove accumulated debris and silt. Work <br />would either be performed by City staff or through <br />contracted services. <br />Department: <br />Project Phase: Design & Construction <br />Total Budget:N/A - Annual Project <br />Project Description: <br />CIP Rating Score: Core <br />Project Funding <br />Project Justification: <br />Fund Description Fund #FY 2025/26 <br />26615 <br />FY 2026/27 <br />27615 <br />FY 2027/28 <br />28615 <br />FY 2028/29 <br />29615 <br />FY 2029/30 <br />30615 <br />Storm Drain Replacement <br />and Renovation 441 $200,000 $200,000 $200,000 $200,000 $200,000 <br />Public Works - <br />Utilities & Environmental Services