My WebLink
|
Help
|
About
|
Sign Out
Planning Commission meeting agenda packet 7-9-25
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
07-09
>
Planning Commission meeting agenda packet 7-9-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2025 3:39:07 PM
Creation date
12/30/2025 3:30:31 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1025
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Vineyard Avenue Residential Project <br />Consistency Checklist 15183 Consistency Checklist <br /> <br />40 <br /> <br />1. All exposed surfaces (e.g., parking areas, staging areas, soil piles, <br />graded areas, and unpaved access roads) shall be watered two times <br />per day. <br />2. All haul trucks transporting soil, sand, or other loose material off-site <br />shall be covered. <br />3. All visible mud or dirt track-out onto adjacent public roads shall be <br />removed using wet power vacuum street sweepers at least once per <br />day. The use of dry power sweeping is prohibited. <br />4. All vehicle speeds on unpaved roads shall be limited to 15 miles per <br />hour (mph). <br />5. All roadways, driveways, and sidewalks to be paved shall be <br />completed as soon as possible. Building pads shall be laid as soon as <br />possible after grading unless seeding or soil binders are used. <br />6. All excavation, grading, and/or demolition activities shall be <br />suspended when average wind speeds exceed 20 mph. <br />7. All trucks and equipment, including their tires, shall be washed off prior <br />to leaving the site. <br />8. Unpaved roads providing access to sites located 100 feet or further <br />from a paved road shall be treated with a six- to 12-inch layer of <br />compacted layer of wood chips, mulch, or gravel. <br />9. Publicly visible signs shall be posted with the telephone number and <br />name of the person to contact at the lead agency regarding dust <br />complaints. This person shall respond and take corrective action within <br />48 hours. The Air District’s General Air Pollution Complaints number shall <br />also be visible to ensure compliance with applicable regulations. <br />The proposed project’s required implementation of the BAAQMD’s BCMMs <br />listed above for the project’s construction activities would help to minimize <br />construction-related fugitive dust emissions to a less-than-significant level. In <br />addition, the proposed project would be required to comply with the <br />provisions of Chapter 9.21, Construction and Demolition Debris, of the City’s <br />Municipal Code, which would be ensured through preparation and approval <br />of a waste management plan (WMP). The WMP would include project <br />information, the hauling and disposal method, and the estimated quantities <br />of materials to be salvaged and/or disposed. <br />In addition, the AQ/GHG Assessment used the California Emissions Estimator <br />Model (CalEEMod) Version 2022 to estimate emissions from on-site <br />construction activity, construction vehicle trips, and evaporative emissions, as <br />well as operational emissions. The project land use types and size were input <br />to CalEEMod, as well as operational year, traffic information, and other
The URL can be used to link to this page
Your browser does not support the video tag.