My WebLink
|
Help
|
About
|
Sign Out
Planning Commission meeting agenda packet 7-9-25
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
07-09
>
Planning Commission meeting agenda packet 7-9-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2025 3:39:07 PM
Creation date
12/30/2025 3:30:31 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1025
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Vineyard Avenue Residential Project <br />15183 Consistency Checklist Consistency Checklist <br /> <br />61 <br /> <br />Heritage Trees by requiring a tree survey plan or tree report be prepared by a <br />certified arborist at the discretion of the City’s Community Development <br />Director. The Housing Element Update FEIR concluded that compliance with <br />applicable goals, policies, programs, and State and federal requirements <br />would reduce impacts to less than significant. <br />Proposed Project Analysis and Conclusion <br />Section 17.16.010 (Permit–Required) of the City’s Municipal Code requires the <br />approval of a tree removal permit prior to the removal of any heritage trees, <br />defined in part as any single-trunked tree with a trunk circumference of 55 <br />inches or more measures at 4.5 feet above ground level; any multi-trunked <br />tree of which the two large trunks have a circumference of 55 inches or more <br />measures at 4.5 feet above ground level; or any tree 35 feet or more in <br />height. <br />A Tree Inventory Report was prepared for the proposed project by <br />Horticultural Associates (see Appendix C),8 as well as an additional <br />Addendum to the original Tree Inventory Report (see Appendix D).9 The Tree <br />Inventory Report evaluated all 10 on-site trees, which are comprised of three <br />olive trees (Olea europaea) and seven black walnut trees (Juglans nigra). <br />The olive trees are part of entry landscaping, while the black walnuts are <br />remnants of past agricultural activities in the surrounding area. According to <br />the Tree Inventory Report Addendum, four of the existing trees are <br />considered heritage trees and are protected under the City’s Municipal <br />Code. However, as discussed in the Tree Inventory Report Addendum, all on- <br />site trees can be preserved. <br />Pursuant to CEQA Guidelines Section 15183(f), “An effect of a project on the <br />environment shall not be considered peculiar to the project or the parcel for <br />the purposes of this section if uniformly applied development policies or <br />standards have been previously adopted by the city or county with a finding <br />that the development policies or standards will substantially mitigate that <br />environmental effect when applied to future projects, unless substantial new <br />information shows that the policies or standards will not substantially mitigate <br />the environmental effect. […]” In the case of the proposed project, if on-site <br />trees required removal, the proposed project would be required to comply <br />with Chapter 17.16 of the Municipal Code. Compliance with the City’s tree <br />ordinance would substantially mitigate effects related to the removal of on- <br /> <br />8 Horticultural Associates. Tree Inventory Report, Vineyard Avenue, Pleasanton, CA. September 13, <br />2024. <br />9 Horticultural Associates. Addendum to Tree Inventory Report. November 23, 2024.
The URL can be used to link to this page
Your browser does not support the video tag.