My WebLink
|
Help
|
About
|
Sign Out
Planning Commission meeting agenda packet 7-9-25
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
07-09
>
Planning Commission meeting agenda packet 7-9-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2025 3:39:07 PM
Creation date
12/30/2025 3:30:31 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1025
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Vineyard Avenue Residential Project <br />15183 Consistency Checklist Consistency Checklist <br /> <br />63 <br /> <br />1. No peculiar impacts related to the proposed project or its site have <br />been identified. <br />2. There are no potentially significant off-site and/or cumulative impacts <br />which were not discussed by the Housing Element Update FEIR. <br />3. No substantial new information has been identified which results in an <br />impact which is more severe than anticipated by the Housing Element <br />Update FEIR. <br />4. MM BIO-1 from the Housing Element Update FEIR, would be required <br />and would reduce potential impacts to below a level of significance <br />consistent with the analysis is the Housing Element Update FEIR. <br />Mitigation Measures <br />Housing Element Update FEIR Mitigation Measures <br />MM BIO-1 Biological Resource Assessment <br />Prior to the approval of any site-specific entitlement, applicants <br />or sponsors of projects on sites where potential special-status <br />species, migratory birds, or nesting birds are determined to be <br />present by a qualified Biologist, then the applicants or sponsors <br />of projects shall retain a qualified Biologist and/or Wetland <br />Regulatory Specialist to prepare a Biological Resource <br />Assessment (BRA). <br />The BRA shall include a project-specific analysis of potential <br />impacts on all biological resources, including impacts on special- <br />status species and their habitat, migratory birds and other <br />protected nesting birds, roosting bats, rare plants, sensitive <br />communities, protected waters and wetlands (analyze project- <br />specific compliance with Clean Water Act [CWA], Porter- <br />Cologne Water Quality Act, and Fish and Game Code, as <br />applicable), wildlife corridors and nursery sites. The BRA shall <br />develop and define prescriptive and site-specific measures <br />reducing potential impacts to a less than significant level. These <br />measures shall be included as conditions of approval for the <br />project and be incorporated into building and grading permits <br />issued for demolition and construction. If a water feature is found <br />to be jurisdictional or potentially jurisdictional, the applicant shall <br />comply with the appropriate permitting process with each <br />agency claiming jurisdiction prior to disturbance of the water <br />feature.
The URL can be used to link to this page
Your browser does not support the video tag.