Laserfiche WebLink
City of Pleasanton—Vineyard Avenue Residential Project <br />Consistency Checklist 15183 Consistency Checklist <br /> <br />98 <br /> <br />Environmental Issue <br />Area <br />Housing <br />Element <br />Update FEIR <br />Determination <br />Effect Peculiar <br />to Project or <br />Site? <br />New Significant <br />Effect? <br />New <br />Significant <br />Off-site, <br />Cumulative <br />Impact? <br />New <br />Information, <br />More Severe <br />Adverse <br />Impact? <br />hazard to the <br />public or the <br />environment? <br />e) For a project <br />located within an <br />airport land use <br />plan or, where <br />such a plan has <br />not been <br />adopted, within <br />two miles of a <br />public airport or <br />public use airport, <br />would the project <br />result in a safety <br />hazard or <br />excessive noise for <br />people residing or <br />working in the <br />project area? <br />Less than <br />significant <br />impact <br />No No No No <br />f) Impair <br />implementation of <br />or physically <br />interfere with an <br />adopted <br />emergency <br />response plan or <br />emergency <br />evacuation plan? <br />Less than <br />significant <br />impact <br />No No No No <br />g) Expose people or <br />structures, either <br />directly or <br />indirectly to a <br />significant risk of <br />loss, injury or death <br />involving wildland <br />fires? <br />Less than <br />significant <br />impact <br />No No No No <br /> <br />A Phase I Environmental Site Assessment (ESA) was prepared for the <br />proposed project by ENGEO Incorporated (ENGEO) for the purpose of <br />identifying potential recognized environmental conditions (RECs) associated <br />with the project site (see Appendix F).13 The Phase I ESA included a <br /> <br />13 ENGEO Incorporated. Phase I Environmental Site Assessment. June 28, 2024.