Laserfiche WebLink
City of Pleasanton—Vineyard Avenue Residential Project <br />Consistency Checklist 15183 Consistency Checklist <br /> <br />108 <br /> <br />Based on the above, impacts related to wildfire risks were adequately <br />addressed in the Housing Element Update FEIR, and the site would not be <br />subject to any peculiar hazards related to the exposure of people or <br />structures, either directly or indirectly, to the risk of loss, injury, or death <br />involving wildland fires. <br />Conclusion <br />With regards to Hazards and Hazardous Materials, the consistency checklist <br />demonstrates that: <br />1. No peculiar impacts related to the proposed project or its site have been <br />identified. <br />2. There are no potentially significant off-site and/or cumulative impacts <br />which were not discussed by the Housing Element Update FEIR. <br />3. No substantial new information has been identified which results in an <br />impact which is more severe than anticipated by the Housing Element <br />Update FEIR. <br />4. No mitigation measures from the Housing Element Update FEIR would be <br />required because the proposed project’s specific impacts would be less <br />than significant. <br />Mitigation Measures <br />Housing Element Update FEIR Mitigation Measures <br />MM HAZ-2 Environmental Site Assessment <br />If a potential site for rezoning is suspected to contain hazardous <br />materials, prior to building permits, the City shall ensure that <br />each project applicant retain a qualified environmental <br />consulting firm to prepare a Phase I Environmental Site <br />Assessment (Phase I ESA) in accordance with the American <br />Society for Testing and Materials (ASTM) Standards in effect at <br />the time of request of issuance of building permits, which would <br />ensure the City is aware of any hazardous materials on-site. The <br />Phase I ESA shall determine the presence of recognized <br />environmental conditions and provide recommendation for <br />further investigation (e.g., preparation of a Phase II ESA, if <br />applicable). Prior to receiving a building or grading permit, <br />project applicants shall provide documentation from the <br />overseeing agency (e.g., Alameda County Environmental <br />Health [ACEH] or Regional Water Quality Control Board) that