Laserfiche WebLink
City of Pleasanton—Vineyard Avenue Residential Project <br />15183 Consistency Checklist Consistency Checklist <br /> <br />137 <br /> <br />Construction Air compressor 80 <br />Source: Veneklasen, December 19, 2024. <br />Table 5 <br />Construction Noise Levels <br />Project Phase Receptor Construction Noise Level (dBA) <br />Phase 1 – Site Clearance <br />East 78 <br />North 76 <br />West 82 <br />South 78 <br />Phase 2 – Grading <br />East 72 <br />North 71 <br />West 77 <br />South 73 <br />Phase 3 – Site Utility <br />East 77 <br />North 75 <br />West 82 <br />South 78 <br />Phase 4 – Foundation and <br />Slab Pouring <br />East 74 <br />North 73 <br />West 79 <br />South 75 <br />Phase 5 – Paving <br />East 75 <br />North 74 <br />West 80 <br />South 76 <br />Phase 6 – Building <br />Construction <br />East 72 <br />North 71 <br />West 77 <br />South 73 <br />Source: Veneklasen, December 19, 2024. <br /> <br />MM NOI-1, as presented in the Housing Element Update FEIR, requires that <br />development projects conduct a site-specific noise analysis that includes <br />measures to reduce potential noise impacts to a less-than-significant level. <br />Consistent with MM NOI-1, a Noise Assessment has been prepared for the <br />proposed project, which includes measures to ensure construction noise <br />would not exceed the applicable threshold. The measures set forth in the <br />Noise Assessment are similar to the recommendations within MM NOI-1. The <br />City of Pleasanton would require the proposed project to comply with the <br />site-specific measures within the Noise Assessment as a Condition of <br />Approval. Accordingly, potential noise impacts associated with the proposed <br />project were adequately addressed in the Housing Element Update FEIR, and <br />the proposed project would not result in any peculiar effects that would <br />require further CEQA review.