My WebLink
|
Help
|
About
|
Sign Out
Planning Commission meeting agenda packet 7-9-25
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
07-09
>
Planning Commission meeting agenda packet 7-9-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2025 3:39:07 PM
Creation date
12/30/2025 3:30:31 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1025
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Amendment to Tract 8724, 0 Vineyard Avenue Planning Commission <br />Page 6 of 11 <br /> <br /> <br />emergency access easement. The design of the subdivision and related improvements <br />does not conflict with the proposed easements. <br /> <br />8. The restriction on approving a tentative subdivision map on land covered by a land <br />conservation contract entered into pursuant to the California Land Conservation Act <br />of 1965 (Williamson Act) is not applicable. <br /> <br />The site is not covered by a land conservation contract, including a Williamson Act contract. <br /> <br />9. The discharge of waste from the proposed subdivision would not result in violation <br />of existing requirements prescribed by the California Regional Water Quality Control <br />Board (RWQCB). <br /> <br />No discharge violation currently exists, and sewer capacity is available for this subdivision. <br />The project would not discharge any waste other than domestic sewage, and all sewage <br />would be discharged into the city’s sanitary sewer system for ultimate treatment. <br />Stormwater runoff would be collected and conveyed through bio-retention basins located <br />on the north and west sides of the parcel. Urban stormwater runoff is required to meet the <br />City’s RWQCB permit requirements for urban development. <br /> <br />ENVIRONMENTAL ASSESSMENT <br />Pursuant to California Environmental Quality Act (CEQA) Guidelines, (Public Resources Code <br />[PRC] § 21000, et seq.), an Environmental Impact Report (EIR) and a Mitigation Monitoring <br />and Reporting Program (MMRP), was prepared and certified by the City of Pleasanton (City) <br />on January 26, 2023 (City of Pleasanton 2023-2031 (6th Cycle) Housing Element Update <br />Program Final Environmental Impact Report, State Clearinghouse No. 2022040091). <br /> <br />An amended Consistency Checklist, reflecting the split park site plan, was prepared pursuant <br />to CEQA Guidelines Section 15183 (Projects Consistent with a Community Plan or Zoning) to <br />determine whether the proposed project requires additional environmental review. The <br />Consistency Checklist is attached to this report as Exhibit C. CEQA Guidelines Section 15183 <br />mandates that projects consistent with the development density established by existing zoning, <br />community plan, or general plan policies for which an FEIR was certified (in this case the <br />Housing Element Update FEIR) shall not require additional environmental review, except as <br />might be necessary to examine whether there are project -specific significant effects peculiar to <br />the project or its site. <br /> <br />Section 15183 specifies that examination of environmental effects shall be limited to those <br />effects that: (1) are peculiar to the project or the parcel on which the project would be located, <br />and were not analyzed as significant effects in a prior EIR on the zoning action, general plan, <br />or community plan, with which the project is consistent, (2) are potentially significant off -site <br />impacts and cumulative impacts which were not discussed in the prior EIR prepared for the <br />zoning action, general plan, or community plan, or (3) are previously identified significant <br />effects which, as a result of substantial new information which was not known at the time the <br />EIR was certified, are determined to have a more severe adverse impact than discussed in the <br />prior EIR. Section 15183(c) further specifies that if an impact is not peculiar to the parcel or to
The URL can be used to link to this page
Your browser does not support the video tag.