My WebLink
|
Help
|
About
|
Sign Out
Planning Commission meeting agenda packet 7-9-25
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
07-09
>
Planning Commission meeting agenda packet 7-9-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2025 3:39:07 PM
Creation date
12/30/2025 3:30:31 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1025
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Page 6 <br /> <br />a. Additions and/or modifications to the structures and garages are prohibited. <br />b. Residents, tenants, guests, etc., are prohibited from parking on the driveway apron. <br />c. Boats, trailers, campers, motor homes, and other recreational vehicles are not <br />allowed to be parked or stored on-site. <br />d. Garages shall not be modified or used for storage in a manner that would interfere <br />with the ability to park cars within the garages of the units and each resident shall <br />utilize the garages for parking of vehicles only. <br />e. Per the Vineyard Avenue Corridor Specific Plan restrictive covenant and disclosures <br />relating to City Approvals and Nearby Uses, including agriculture, airport, planned <br />development within the Vineyard Corridor Specific Plan, public trail, regional park, <br />City park subdrains and gravel, quarry and asphalt batch plant operations. <br /> <br />33. CONDITIONS OF APPROVAL: The applicant shall provide all initial buyers with copies of <br />the final project conditions of approval. <br /> <br />Environmental <br />34. Project must comply with the Mitigation Monitoring and Reporting Program including the <br />following mitigations: <br />• MM AIR-1a: Prior to the issuance of a grading or building permit, whichever is <br />sooner, the project applicant for a potential site for rezoning shall submit an air quality <br />construction plan detailing the proposed air quality construction measures related to the <br />project such as construction phasing, construction equipment, and dust control <br />measures, and such plan shall be approved by the Director of Community Development <br />or designee. Air quality construction measures shall include (1) Basic Construction <br />Mitigation Measures, as approved by the Bay Area Air Quality Management District <br />(BAAQMD) in 2017, or the then currently adopted guidelines, and, (2) where <br />construction-related emissions would exceed the applicable thresholds as demonstrated <br />by a qualified consultant conducted pursuant to methodologies considered acceptable at <br />that time, Additional Construction Mitigation Measures, as recommended by the <br />BAAQMD, shall be implemented to reduce emissions to acceptable levels. The air <br />quality construction plan shall be included on all grading, utility, building, landscaping, <br />and improvement plans during all phases of construction and for access roads, parking <br />areas, and staging areas at construction sites. <br /> <br />• MM AIR-1b: The following measures pertain to project sites where residences would <br />be located within distances where the Bay Area Air Quality Management District <br />(BAAQMD) or the California Air Resources Board (ARB) recommends not siting <br />residential uses due to exposures to Toxic Air Contaminants. For example, the current <br />2005 ARB Land Use Book recommends that agencies avoid siting new sensitive land <br />uses within 500 feet of a freeway, urban roads within 100,000 vehicles/day, or rural <br />roads with 50,000 vehicles/day. <br />Indoor Air Quality–In accordance with the recommendations of the BAAQMD, <br />appropriate measures (refer to Section 5 of the BAAQMD CEQA Guidelines) shall be <br />incorporated into building design in order to reduce the potential health risk due to <br />exposure of sensitive receptors to TACs, including, but not limited to: <br />a. locate sensitive receptors as far as possible within each project site from any <br />freeways, major roadways or other non-permitted TAC sources (e.g., loading <br />docks, parking lots);
The URL can be used to link to this page
Your browser does not support the video tag.