Laserfiche WebLink
<br />Page 10 <br /> <br />construction-related vibration impacts. <br /> <br />35. Prior to the issuance of a grading or building permit, the project applicant shall submit an <br />air quality construction plan that includes BAAQMD basic Best Management Practices. <br />• All exposed surfaces (e.g., parking areas, staging areas, soil piles, graded areas, and <br />unpaved access roads) shall be watered two times per day. <br />• All haul trucks transporting soil, sand, or other loose material off-site shall be covered. <br />• All visible mud or dirt track-out onto adjacent public roads shall be removed using wet <br />power vacuum street sweepers at least once per day. The use of dry power sweeping <br />is prohibited. <br />• All vehicle speeds on unpaved roads shall be limited to 15 miles per hour (mph). <br />• All roadways, driveways, and sidewalks to be paved shall be completed as soon as <br />possible. Building pads shall be laid as soon as possible after grading unless seeding <br />or soil binders are used. <br />• All excavation, grading, and/or demolition activities shall be suspended when average <br />wind speeds exceed 20 mph. <br />• All trucks and equipment, including their tires, shall be washed off prior to leaving the <br />site. <br />• Unpaved roads providing access to sites located 100 feet or further from a paved road <br />shall be treated with a 6- to 12-inch layer of compacted layer of wood chips, mulch, or <br />gravel. <br />• Publicly visible signs shall be posted with the telephone number and name of the <br />person to contact at the lead agency regarding dust complaints. This person shall <br />respond and take corrective action within 48 hours. The Air District’s General Air <br />Pollution Complaints number shall also be visible to ensure compliance with <br />applicable regulations. <br /> <br />HOUSING DIVISION – 925-931-5007 <br />36. AFFORDABLE HOUSING AGREEMENT: The applicant shall execute an approved <br />Affordable Housing Agreement which sets forth the methodology for the applicant's <br />compliance with Pleasanton Municipal Code Chapter 17.44 requirements. Staff will draft the <br />Agreement and forward to applicant for review. <br />BUILDING AND SAFETY DIVISION – 925-931-5300 <br />37. BUILDING AND FIRE CLEARANCE: Prior to issuance of a business license, the applicant <br />shall contact the Building and Safety Division and the Fire Department to ensure the <br />proposed use of the tenant space meets Building and Fire Code requirements. If required, <br />the applicant shall obtain all appropriate City permits. <br /> <br />38. PHASED OCCUPANCY: If building occupancy is proposed to be phased, the applicant shall <br />submit a phasing plan to the Chief Building and Safety Official for review and approval. <br /> <br />39. DIGITAL PLAN SUBMITTAL REQUIREMENT – COMMERCIAL, MULTI-FAMILY <br />RESIDENTIAL AND CONDOMINIUM PROJECTS: The applicant shall submit site plan and <br />building information to the City’s Geographic Information Services (GIS) Division in a digital <br />format prior to issuance of the building permit. All changes or revisions to the approved <br />plans during construction which affect the digital submittal, shall be resubmitted for GIS <br />review no later than one month prior to scheduling a final inspection. The updated digital