Laserfiche WebLink
<br />Page 28 <br /> <br />restrictions for all non-potable construction-related water needs. Recycled water is available <br />at designated locations within the City, subject to the applicant’s receipt of a temporary hydrant <br />meter from the Operations Service Center located at 3333 Busch Road. The applicant is <br />responsible for all water costs based on current billing rates. (Address this condition during <br />construction) <br />Post Construction <br />116. GEOTECHNICAL FINAL REPORT: At the conclusion of construction, the applicant shall <br />submit to the City a final report from the Geotechnical Engineer or Certified Engineering <br />Geologist testifying to the successful completion of all material testing and/or observation work <br />performed. The final report must provide assurance that all recommendations have been <br />strictly followed. The applicant shall bear all costs associated with this condition. (Address this <br />condition prior to acceptance of improvement or issuance of an Occupancy Permit) <br />117. GEOGRAPHIC INFORMATION SYSTEMS: The City’s Geographic Information Systems (GIS) <br />staff publish digital maps that enable first responders to efficiently navigate to locations where <br />calls for service have been requested. The maps are also shared with agencies and <br />departments that provide other critical services to residents such as mail delivery. To keep <br />these maps current, the City requires an as-built plan or map information to be submitted by <br />the applicant in a format that integrates with ArcGIS by ESRI. The “Digital Submittal <br />Requirements” are available for download at the following weblink: <br />https://www.cityofpleasantonca.gov/gov/depts/gis.asp <br />(Address this condition prior to acceptance of improvement or issuance of an Occupancy <br />Permit) <br />118. DAMAGE TO EXISTING PUBLIC OR PRIVATE IMPROVEMENTS: The applicant shall repair <br />damage to existing public or private improvements on and near the project site and along the <br />haul route at the applicant’s expense if caused by construction activities. (Address this <br />condition prior to acceptance of improvements or issuance of an Occupancy Permit) <br /> <br />END