Laserfiche WebLink
Pleasanton BART October 9, 2025 <br />Site Re-Use Options Memorandum <br /> <br /> <br />18 <br /> <br /> <br />ii. Option TF-2 <br /> <br /> Figure 5-12: Test fit option with wrap building and BART and residential parking on Site 3. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Base totals show the Site 3 building at five stories, while the alternative totals reflect a “maximized” eight-story <br />version. <br /> <br /> <br /> <br /> <br />Figure 5-13: Articulated 3D massing of test option TF-2. <br />