Laserfiche WebLink
Pleasanton BART October 9, 2025 <br />Site Re-Use Options Memorandum <br /> <br /> <br />20 <br /> <br />• SITE 3: <br />Five-story Wrap Building with BART and residential parking <br />This is a wrap building with a central four-story garage and two five-story “wings” on <br />either side with at-grade courtyards. Alternatively, this has also been studied as an eight- <br />story wrap building with a five-story central garage, a “max buildout” scenario. <br />Depending on the final BART amount of parking, as determined by BART, the number of <br />levels in the garage dedicated to BART rider parking can vary. <br /> <br /> <br /> <br /> <br /> <br /> <br />Figure 5-16: Floor plans showing a wrap building on the larger Site 3/4. <br />