Pleasanton BART <br />Existing Physical Site Conditions Opportunities and Constraints Evaluation Oct 16, 2025 <br /> <br /> <br /> <br />10 <br />• Restriping of bike lanes along a section of Owens Dr. to enable bicyclists to cross the street <br />more smoothly at the existing signalized mid-block crosswalk. <br />• The westernmost parking lot (Lot D; used for Reserved Parking) will likely be used as a <br />staging area during construction. <br />• Pedestrian-scale lighting <br />• Added wayfinding and signage <br />• Public art panels <br /> <br />Project stage: Invitation for Bid drawings were issued in Dec 2024. Construction is expected to <br />start in late 2025 or early 2026. <br /> <br /> <br />ii. Valley Link Line and Station <br /> <br />Valley Link is a planned passenger rail service connecting the northern San Joaquin Valley to <br />the Tri-Valley. The first leg of this new system is proposed to run between Dublin/Pleasanton <br />and the Vasco Road ACE station with one additional station along the way. The alignment of <br />this segment is mostly to be constructed within the existing freeway median (along I-580). <br /> <br /> <br />Exhibits included in the Environmental Assessment from late 2024 show the proposed Dublin/ <br />Pleasanton Valley Link Station sited south of the eastbound I-580 freeway and the existing <br />Dublin/Pleasanton BART Station. The new station is designed to provide intermodal service <br />between Valley Link, BART and local bus transit. Passengers wishing to transfer from Valley <br />Link to BART or vice versa, would travel down to ground level, exit the station, and cross under <br />part of I-580 to go to the transfer station. The proposed station design does not include the <br />construction of any additional parking for the new station. <br /> <br />The scope of this work that impacts the project site includes: <br />• A 642-foot-long by 30-foot-wide, double-track Valley Link aerial station platform, <br />approximately 34 feet above ground with shade canopies. <br />• Stairs, escalators, and elevators for vertical circulation within the station <br /> <br />Figure 3-3: Right of way plan for new Valley Link station and track, showing station location adjacent to the project <br />site and the temporary construction easement required. <br />DRA <br />F <br />T