Laserfiche WebLink
Pleasanton BART <br />Existing Physical Site Conditions Opportunities and Constraints Evaluation Oct 16, 2025 <br /> <br /> <br /> <br />20 <br />f. Planned infrastructure improvements <br /> [OPPORTUNITY/CONSTRAINT] <br /> <br />i. Iron Horse Trail upgrades <br />Any new development will need to incorporate the planned improvements to the Iron Horse Trail <br />segment that runs through the project site. See section 1.c.i. of this memo for the scope of the <br />improvements. <br /> <br />ii. Valley Link line and station <br />The station concept plan will factor in the planned Valley Link line and station as an existing <br />condition. It is crucial for any new development to maintain the anticipated temporary <br />construction easement that would be necessary during the construction of the station and line. <br />This anticipated easement is shown in the exhibit below. <br /> <br /> <br />g. Adjacent Housing development <br /> [OPPORTUNITY] <br /> <br />i. The Galloway Apartments <br />Across Owens Dr is another TOD project, The Galloway Apartments (site area 8.42 Ac, density <br />~30DU/Ac) that was completed in 2017. Having a completed project in the immediate context is <br />helpful and shows what the lower end of the allowed density on the project site looks like. This <br />project also has a modified street frontage along Owens Dr that is a good reference for potential <br />similar improvements on the north side. <br /> <br /> <br />Figure 0-1: Basemap with planned infrastructure upgrades overlaid <br />DRA <br />F <br />T