Laserfiche WebLink
Pleasanton BART <br />Existing Physical Site Conditions Opportunities and Constraints Evaluation Oct 16, 2025 <br /> <br /> <br /> <br />22 <br />6. Key Takeaways <br /> <br />a. Determining project density and affordability <br /> <br />While the ranges of allowable residential density for this site vary between jurisdictions, the <br />actual density and number of units will be determined by market conditions, feasibility, and the <br />building code. The number of affordable units and their level of affordability will need to be <br />determined carefully (by any future developer selected for this site) to meet BART minimums <br />(which are higher than the City’s requirements and BART's goals. <br /> <br /> <br />b. Determining development and BART rider parking requirements <br /> <br />Applicable state laws such as AB 2097 effectively eliminate minimum parking requirements for <br />developments within 0.5mi of a major transit stop (such as a BART station). AB 2923 and MTC <br />policy set a maximum residential parking ratio of 1:1. <br />Based on estimated demand for BART rider parking spaces, there appear to be more BART <br />parking spaces available on the Dublin side of the station than the demand on the Pleasanton <br />side (not including the County garage on the Dublin side). Other data also reveal that only ~35% <br />of the spaces on the Pleasanton side are used by riders driving from Pleasanton/ areas to the <br />south2, while most of the spaces are used by riders from areas further east (such as <br />Livermore/Tracy). <br />Notably, driving to the parking facilities on the Dublin side of the station versus the Pleasanton <br />side of the station is virtually the same in terms of time and distance. Therefore it is reasonable <br />to assume that parking on the Dublin side is equally convenient. <br /> <br />To ensure project feasibility and success, it will be critical to analyze and determine the <br />appropriate parking need for both the new development and BART riders on the Pleasanton <br />side. A station access planning and parking management study will be conducted prior to BART <br />releasing its developer Request for Proposals. That study is slated to begin soon, and will <br />include parking analysis to determine the maximum level of on-site BART rider parking to be <br />provided in future development on the site. It is also important that proposed parking numbers <br />are amenable to all stakeholders and ratified to provide certainty to future developers. <br /> <br /> <br />c. Site Circulation <br /> <br />It is crucial to maintain access to the various existing and proposed transit infrastructure as well <br />as the other infrastructure and utilities that are accessed from the project site during <br />construction and once the TOD is built. This will impact any proposed circulation and the extent <br />of developable area on the site. It is also important for any circulation and drop-offs to adhere to <br />BART’s MADG where possible. Also, it is important to maintain accessible drop-offs as close to <br />the station entry as needed, while closely adhering to PROWAG. <br />Opportunities to increase and improve pedestrian and bike circulation throughout the site will <br />also need to be studied. Any interfaces between vehicular and pedestrian circulation (including <br />those with the IHT at Owens Dr) will need to be well managed for a safe and comfortable user <br />experience. <br /> <br /> <br />2 Refer to section 7.b of this memo for more information regarding BART rider parking <br />demand/occupancy. <br />DRA <br />F <br />T