My WebLink
|
Help
|
About
|
Sign Out
Planning Commission Agenda Packet 102225 (1)
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
10-22
>
Planning Commission Agenda Packet 102225 (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2025 4:35:02 PM
Creation date
12/30/2025 4:30:37 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
August 7, 2025 <br />Page 4 BKF ENGINEERS <br />fire flows above 2,447 GPM are required, additional modeling should be performed to ensure the city system can <br />meet the required demand. <br /> <br />8. Recycled Water System <br />The City of Pleasanton owns and maintains a recycled water distribution system that provides water that can be <br />used for landscape irrigation in lieu of using potable water. Per the City’s Recycled Water Distribution map, there <br />are no recycled water pipes located in Owens Drive in the area where the project has frontage, but a 6-inch <br />recycled water pipe appears to dead end near the southeast corner of the project site along Owens Drive. The <br />project should anticipate extending this 6-inch line, likely from Willow and Owens to create a looped system. <br /> <br />Recycled water use is estimated to be 7,000 GPD, based on 26 gallons/SF/year, and assuming that 15% of the 14.9- <br />acre site is landscape. The 26 gallons/SF/year estimate comes from the City of Redwood City Landscaping Water <br />Demand projection, as the City of Pleasanton does not provide demand projections for landscape water usage. <br /> <br />Refer to Appendix C for the recycled water maps provided by the City of Pleasanton. <br /> <br />9. Sanitary Sewer System <br />The sewer system in the area is owned and operated by the City of Pleasanton. An 8-inch VCP sewer main is located <br />in Owens Drive west of Willow Road, and a 12-inch VCP sewer main is located in Owens Drive east of Willow Road. <br />A 6-inch sanitary sewer main runs through the site, connecting the BART station to the sewer main in Owens Drive. <br />Refer to Appendix D for the sewer map provided by the City of Pleasanton. <br /> <br />Estimates for sanitary sewer average dry weather flow 254,000 gpd, based on a 0.65 factor applied to water demands <br />stated in section 7 above. The 0.65 factor is based on the estimate provided in the 2005 Pleasanton Plan 2025 for <br />multi-family residential. Peak dry weather flow is estimated to be 440 GPM, assuming flows are spread across a <br />24-hour day, with a peaking factor of 2.5. <br /> <br />10. Storm Drain System <br />The storm drain system in the area is owned and operated by the City of Pleasanton and Alameda County. In Owens <br />drive near the west side of the project site, a city-owned 24-inch storm drain main flows to the intersection with <br />Willow Road, and a city-owned 42-inch storm drain flows from the intersection with Willow Road to Chabot Canal, <br />where it outfalls into the Canal. In Owens drive near the east side of the project site, a 60-inch storm drain main <br />flows toward Iron Horse Trail, where it meets a county-owned 66-inch storm drain main that runs through the <br />project site along Iron Horse Trail. Some existing catch basins on the project site flow to the city mains in Owens <br />Drive, others flow to the county main in Iron Horse Trail, and others discharge directly into Hewlett Canal to the <br />north. <br /> <br />Refer to Appendix D for the storm drain map provided by the City of Pleasanton. <br /> <br />11. Stormwater Quality <br />The project would create more than 10,000 square-feet of impervious surface and will therefore be required to treat <br />stormwater runoff as outlined in Provision E.12 of the Phase II Small MS4 General Permit. Provision E.12 requires <br />Low Impact Development (LID) techniques to reduce runoff, treat stormwater, and provide baseline <br />hydromodification management to the extent feasible. LID techniques primarily include infiltration and stormwater <br />re-use. If infiltration will not be feasible on this site, landscape-based LID techniques such as bioretention areas are <br />acceptable as an alternative compliance measure. Stormwater treatment strategies often compete with other site <br />functions within the development so it is important to coordinate treatment areas early in the design process. <br /> <br />The project may be eligible for LID treatment reduction credits based on being an affordable housing project. These <br />credits would reduce the amount of bioretention treatment facilities required, but would require stormwater to be <br />treated by a proprietary stormwater media filter instead. In order to qualify for LID treatment reduction credits, the <br />DRA <br />F <br />T
The URL can be used to link to this page
Your browser does not support the video tag.