Laserfiche WebLink
Special Projects Worksheet (continued) <br /> <br /> 3 Updated February 2024 <br />Category Impervious Area <br />Created/Replaced <br />(sq. ft.) <br />Site <br />Coverage <br />(%) <br />Project <br />Density <br />or FAR <br />Density/Criteria Allowable <br />Credit <br />(%) <br />Applied <br />Credit <br />(%) <br />Gross density ≥ 60 DU/Ac 10% <br />Gross density ≥ 100 DU/Ac 15% <br /> Parking credit (select one): <br />Includes no surface parking, <br />except for incidental parking for <br />emergency vehicle access, <br />ADA access, and passenger or <br />freight loading zones <br />5% <br />TOTAL CATEGORY C CREDIT = <br /> <br />3. Narrative Discussion of the Feasibility/Infeasibility of 100% LID Treatment: <br />If project will implement less than 100% LID, prepare a discussion of the feasibility or infeasibility of 100% LID <br />treatment, as described in Appendix J of the C.3 Technical Guidance. <br />4. Select Certified Non-LID Treatment Measures: <br />If the project will include non-LID treatment measures, select a treatment measure certified for “Basic” General <br />Use Level Designation (GULD) by the Washington State Department of Ecology’s Technical Assessment Protocol <br />– Ecology (TAPE). Guidance is provided in Appendix J of the C.3 Technical Guidance.6 <br />Special Projects Worksheet Completed by: <br /> <br />Signature Date <br /> <br /> <br /> <br />Print or Type Name <br /> <br /> <br />Table 1 Affordable Housing Credit Multipliers <br />AMI Credit Multiplier <br />Moderate (≤120% of AMI) 0.20 <br />Low (≤ 80% of AMI) 1.00 <br />Very Low (≤ 50% of AMI) 2.00 <br />Extremely Low (≤ 30% of AMI) 3.00 <br />Acutely Low (≤ 15% of AMI)7 4.00 <br /> <br /> <br />6 TAPE certification is used in order to satisfy Special Project’s reporting requirements in the MRP. <br />7 Dwelling units that are free to tenants, i.e., there is no charge to tenants for any rent/mortgage, are included in this category.